International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2006-10-30�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2006-10-30)�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting� from 2006-10-30 to 2006-11-10

held in Switzerland [Geneva]

Other Meetings : 2008-12-012008-02-112007-06-042006-02-062005-05-162004-11-29

Results:65 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�AI/Question:�Q12/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 291 ]
Channel transparency in G.805 and G.ufatn � Alcatel Q12/15 2006-10-20
[ 289 ]
Functional Classes and Network Modes � Tellabs Oy Q12/15 2006-10-22
[ 288 ]
A Unified Modelling View of OAM Modes � Tellabs Oy Q12/15 2006-10-22
[ 287 ]
Modelling Ethernet VLANs � Tellabs Oy Q12/15 2006-10-20
[ 286 ]
Considerations for Modelling Timing and Synchronization � Tellabs Oy Q13/15, Q12/15 2006-10-20
[ 285 ]
Semantics of Functional Modelling Diagrams � Tellabs Oy Q12/15 2006-10-20
[ 284 ]
T-MPLS Control Plane Requirements � Tellabs Oy Q12/15 2006-10-20
[ 281 ]
Proposal for a specification of the architecture of Packet Transport Networks � Deutsche Telekom Q12/15 2006-10-20
[ 274 ]
T-MPLS Definition � Alcatel , Ericsson Q12/15, Q9/15 2006-10-20
[ 273 ]
Proposed mechanism for T-MPLS TCM using label stacking � Alcatel Q12/15, Q11/15, Q9/15 2006-10-20
[ 272 ]
Proposed text for Draft Amendment 1 to Recommendation G.8110.1 � Alcatel , Huawei Technologies Q12/15 2006-10-20
[ 271 ]
Transport MPLS Protection Architecture � Alcatel Q12/15, Q9/15 2006-10-20
[ 266 ]
T-MPLS Control Plane Architecture � Alcatel Q12/15 2006-10-20
[ 265 ]
Proposal for T-MPLS TCM using label stacking � Alcatel Q12/15, Q9/15 2006-10-20
[ 260 ]
Channel/senders/receivers complex model � Alcatel Q12/15 2006-10-20
[ 259 ]
Unifying G.805 and G.809 � Lucent Technologies UK , KPN Q12/15 2006-10-20
[ 243 ]
Proposal to continue work on 10GbE bit rates � Cisco Systems Q14/15, Q12/15, Q11/15 2006-10-20
[ 242 ]
Impact of T-MPLS on a carrier operations group � Cisco Systems Q14/15, Q12/15, Q11/15, Q9/15 2006-10-20
[ 240 ]
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet � AT&T , Sprint Nextel , Verizon Q12/15, Q11/15, Q9/15, Q6/15 2006-10-20
[ 233 ]
Proposal for T-MPLS MIP Identification � Alcatel Q12/15, Q9/15 2006-10-20
[ 231 ]
Multi-layer T-MPLS network architecture and layer network signal formats � Alcatel Q12/15, Q11/15 2006-10-20
[ 228 ]
Work Load of Q12/15 - Proposal for advanced working methods � Alcatel Q12/15 2006-10-20
[ 214 ]
Proposal of operation scenarios for VCAT and LCAS management in ASON � NTT Q12/15 2006-10-20
[ 209 ]
Definition of SNP states in LRM � ZTE Corporation Q12/15 2006-10-20
[ 207 ]
Combination of protection and restoration in G.8080 � ZTE Corporation Q12/15 2006-10-20
[ 203 ]
A proposal for T-MPLS support of the Diff-Serv � ZTE Corporation Q12/15 2006-10-20
[ 201 ]
The corrigendum for G.8080 and G.7713 � ZTE Corporation Q14/15, Q12/15 2006-10-20
[ 200 ]
Some concerns on the new-type control plane for circuit & packet transport network � ZTE Corporation Q14/15, Q12/15 2006-10-20
[ 198 ]
Proposals to add directory service component into G.8080 � ZTE Corporation Q12/15 2006-10-20
[ 182 ]
Proposed enhancement to G.805 and G.ufatn scope and introduction text � Alcatel Q12/15 2006-10-19
[ 180 ]
Proposal to start the development of a MPLS service specification � Alcatel Q12/15, Q11/15 2006-10-19
[ 170 ]
Proposal of adding sharing channel protection in G.8080 � China Unicom , Alcatel Shanghai Bell Q12/15 2006-10-19
[ 168 ]
Component interactions for the multi connection setup � MII China Q12/15 2006-10-19
[ 160 ]
Proposed scope of G.8110.1 Amendment 1 � Fujitsu Q12/15 2006-10-19
[ 159 ]
Proposed TTL description for G.8110.1 Amendment 1 � Fujitsu Q9/15, Q12/15 2006-10-19
[ 158 ]
Consideration on T-MPLS OAM architecture for G.8110.1 Amendment 1 � Fujitsu Q12/15 2006-10-19
[ 151 ]
Path Degradation in Packet Transport Network � Huawei Technologies Q9/15, Q12/15 2006-10-19
[ 148 ]
VS Tunnel Multiplexing and Services Discussion � Huawei Technologies , Siemens AG , China Telecom Q12/15 2006-10-19
[ 146 ]
Proposal for TCM in G.8110.1 � Huawei Technologies Q12/15 2006-10-19
[ 145 ]
Propose to add RPR/TM adaptation function � Huawei Technologies Q12/15 2006-10-19
[ 144 ]
Shared Bandwidth Rate Control � Huawei Technologies Q12/15, Q9/15 2006-10-19
[ 143 ]
Proposal for FC over T-MPLS � Huawei Technologies Q12/15 2006-10-19
[ 103 ]
All Optical Packet Networks: outcomes of the IST LASAGNE project � Telecom Italia Q7/15, Q6/15, Q12/15 2006-10-18
[ 93 ]
Comment on G.8021 and G.8010 � BT Q12/15, Q9/15 2006-10-18
[ 92 ]
Comments on G.8110.1 � BT Q12/15 2006-10-18
[ 89 ]
Unified model - Topology � Nortel Networks (Canada) Q12/15 2006-10-18
[ 88 ]
Unified model - Symbols and conventions � Nortel Networks (Canada) Q12/15 2006-10-18
[ 87 ]
Unified model - Identifiers � Nortel Networks (Canada) Q12/15 2006-10-18
[ 86 ]
Unified model - Division of layer network resources � Nortel Networks (Canada) Q12/15 2006-10-18
[ 85 ]
Unified Model - Sublayers � Nortel Networks (Canada) Q12/15 2006-10-18
Results:65 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10