International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2005-05-16�: Delayed Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� D�(2005-05-16)�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting� from 2005-05-16 to 2005-05-27

held in Switzerland [Geneva]

Other Meetings : 2008-12-01� 2008-02-11� 2007-06-04� 2006-10-30� 2006-02-06� [ 2005-05-16 ]� 2004-11-29

Results:28 total items.
Delayed Contributions �[�AI/Question:�Q13/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 402 ]
IEEE1588TM Overview � Zarlink Semiconductor Q13/15 2005-05-04
[ 386 ]
IEEE 1588 : PAR work and field trial results, with reference to G.pactiming � Semtech Q13/15 2005-05-04
[ 381 ]
G.pactiming - Clock Recovery with Time Stamps (Common Clock) � Israel MOC Q13/15 2005-05-04
[ 380 ]
G.pactiming - Exploiting PDV Non-Gaussianity � Israel MOC Q13/15 2005-05-04
[ 379 ]
G.pactiming - Transport of SDH over PSNs � Israel MOC Q13/15 2005-05-04
[ 378 ]
G.pactiming - Timing Recovery Scenarios � Israel MOC Q13/15 2005-05-04
[ 377 ]
G.pactiming - Proposed Text for Scope � Israel MOC Q13/15 2005-05-04
[ 376 ]
G.pactiming - Use of G.805/G.809 Functional Diagrams � Israel MOC Q13/15 2005-05-04
[ 375 ]
G.pactiming - The Effect of Packet Loss and Misordering on Timing Recovery � Israel MOC Q13/15 2005-05-04
[ 350 ]
Proposals on network scenarios and models for the G.pactiming � Ericsson Q13/15 2005-05-03
[ 349 ]
Proposals addressing some Study Points of the G.pactiming living list � Ericsson Q13/15 2005-05-03
[ 348 ]
Proposals for synchronization network limits in the G.pactiming � Ericsson Q13/15 2005-05-03
[ 347 ]
Proposed text for G.pactiming Annex A � Alcatel Q13/15 2005-05-03
[ 333 ]
2 048 kbit/s interfaces in the ITU-T G.813 � Ericsson Q13/15 2005-05-03
[ 316 ]
Proposal for ODU over SDH equipment functions � Lucent Technologies Germany Q13/15, Q9/15 2005-05-04
[ 291 ]
Proposals for G.813 to add frequency verge for rejecting a reference clock � Huawei Q13/15 2005-05-02
[ 280 ]
Typical Noise Transfer CES Type Services � BT Q13/15 2005-05-02
[ 279 ]
Generic Physical Layer Element Clock Function - GEC � BT Q13/15 2005-05-02
[ 278 ]
Next Generation Synchronisation Architecture � BT Q12/15, Q13/15 2005-05-02
[ 277 ]
Contribution to ITU-T G.pactiming � BT Q13/15 2005-05-02
[ 276 ]
Proposed text for G.pactiming � Alcatel Q13/15 2005-05-02
[ 275 ]
Requirements of G.modem synchroniser and desynchronizer � Alcatel Q13/15 2005-05-02
[ 274 ]
Add 2 Mbit/s output jitter specification in G.813 � Alcatel Q13/15 2005-05-02
[ 264 ]
SSM Support in Ethernet PHY links � BT Q13/15, Q12/15, Q9/15 2005-05-02
[ 262 ]
Draft of G.pactiming: interface requirements � Ukraine Q13/15 2005-05-02
[ 261 ]
Draft of G.pactiming: Proposed definition � Ukraine Q13/15 2005-05-02
[ 216 ]
Proposal to include 1544 kbit/s requirements in G.813 � Nortel Networks USA Q13/15 2005-05-01
[ 197 ]
Transporting Synchronisation over Ethernet � UK Q13/15, Q12/15, Q9/15 2005-04-25
Results:28 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10