International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG13 : Meeting�2005-08-29�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG13� TD-WP4�(2005-08-29)�

ITU-T�SG13

Next-generation networks

Study Period 2005

Meeting� from 2005-08-29 to 2005-09-09

held in Switzerland [Geneva]

Other Meetings : 2009-09-01� 2009-01-12� 2008-09-122008-05-222008-01-142007-09-212007-04-162006-11-032006-07-172006-01-16� [ 2005-08-29 ]� 2005-04-252004-12-07

Results:15 total items.
Temporary Documents �(WP4) �[�AI/Question:�Q5/13�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 38-WP4 ]
Q.5/13 approved Liaisons � Rapporteur Q.5/13 Q5/13 2005-09-07
[ 37-WP4 ]
Report of the Meeting of Q.5/13 (OAM and network management for NGN) � Rapporteur Q. 5/13 Q5/13 2005-09-07
[ 36-WP4 ]
Proposed Amendment 1 to Y.1711 (02/04) - For Consent � Rapporteur Q.5/13 Q5/13 2005-09-07
[ 35-WP4 ]
Draft Agenda for the Closing Meeting of Working Party 4/13 � Chair WP 4/13 Q5/13, Q4/13 2005-09-07
[ 31-WP4 ]
(Rev.1-2)
Documentation, Proposed Work Schedule, and Liaison Activities for the August-September 2005 Meeting of Working Party 4/13 (QoS and OAM) � Chairman WP 4/13 Q5/13, Q4/13 2005-08-26
[ 30-WP4 ]
Introduction to the work of Q.5/13 � Rapporteur Q.5/13 Q5/13 2005-08-26
[ 29-WP4 ]
Virtual Bridged Local Area Networks - Amendment 5: Connectivity Fault Management � IEEE 802.1 Q5/13 2005-08-25
[ 27-WP4 ]
Liaison Statement to Q.5/13 � Metro Ethernet Forum Q5/13 2005-08-17
[ 25-WP4 ]
NGN Management Architecture Specifications � ETSI TISPAN WG 8 Q5/13 2005-07-29
[ 24-WP4 ]
Reply to Liaison Statement on EtherType codes for Ethernet OAM � IEEE 802.1 Q5/13 2005-07-26
[ 23-WP4 ]
Approval of NGN Management Specifications � ETSI TISPAN WG8 Q5/13 2005-06-29
[ 22-WP4 ]
Liaison to Q.5/13 regarding bi-directional MPLS protection switching with APS � ITU-T SG 15 Q5/13 2005-06-16
[ 21-WP4 ]
Response to SG 13 laison statements on Ethernet Management � ITU-T SG 15 Q5/13 2005-06-16
[ 20-WP4 ]
Response to liaison statement on a per domain approach for MPLS OAM � ITU-T SG 15 Q5/13 2005-06-16
[ 19-WP4 ]
Reply to liaison statement on Ethernet performance parameters � ITU-T SG 15 Q5/13 2005-06-16
Results:15 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10