International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG12 : Meeting�2005-01-18�: Delayed Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG12� D�(2005-01-18)�

ITU-T�SG12

Performance and quality of service

Study Period 2005

Meeting� from 2005-01-18 to 2005-01-27

held in Switzerland [Geneva]

Other Meetings : 2009-11-03� 2009-03-10� 2008-05-22� 2007-10-02� 2007-01-16� 2006-06-052005-10-17� [ 2005-01-18 ]�

Results:3 total items.
Delayed Contributions �[�AI/Question:�Q11/12�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 54 ]
Proposal of a Loss Per Unit Time Metric for Revised Y.1541 and Y.1540 � Cisco Systems, Inc Q10/12, Q13/12, Q11/12, Q17/12 2005-01-07
[ 53 ]
Analysis of a High Percentile Concatenation Method for Revised Y.1541 � Cisco Systems, Inc Q10/12, Q13/12, Q11/12, Q17/12 2005-01-07
[ 43 ]
Analysis of Jitter Concatenation Methods for Revised Y.1541 � AT&T Q10/12, Q13/12, Q11/12, Q17/12 2005-01-07
Results:3 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-5