Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
�
� |
Proposal of Peer-to-Peer Approach for Distributed Content Distribution
�
� |
Huawei Technologies Co., Ltd.
� |
Q7/11, Q3/13, Q3/11, Q2/13, Q1/11, IPTV-GSI
� |
2008-01-11 |
|
[ 144 ]
�
� |
Proposal on IGMP Filter in DOC-0190
�
� |
China Telecom
� |
Q3/13, Q2/13, Q2/11, Q1/11, IPTV-GSI
� |
2008-01-11 |
|
[ 143 ]
�
� |
Add interactions with other services to the draft of Q.CRBT_CRT
�
� |
ZTE Corporation
� |
2/11, 3/11
� |
2008-01-09 |
|
[ 142 ]
�
� |
Add IMS signalling requirement for CRT to the draft of Q.CRBT_CRT
�
� |
ZTE Corporation
� |
2/11, 3/11
� |
2008-01-09 |
|
[ 141 ]
�
� |
Add IMS signalling requirement for CRBT to the draft of Q.CRBT_CRT
�
� |
ZTE Corporation
� |
2/11, 3/11
� |
2008-01-09 |
|
[ 140 ]
�
� |
Add of References to the draft of Q.CRBT_CRT
�
� |
ZTE Corporation
� |
2/11, 3/11
� |
2008-01-09 |
|
[ 139 ]
�
� |
Add interaction between CDIVN and OIR/TIR
�
� |
ZTE Corporation
� |
3/11
� |
2008-01-09 |
|
[ 138 ]
�
� |
Add service/signalling flows for CRBT/CRT to the draft of Q.CRBT_CRT
�
� |
ZTE Corporation
� |
2/11, 3/11
� |
2008-01-09 |
|
[ 137 ]
�
� |
Modifications to the draft of Q.ECT
�
� |
ZTE Corporation
� |
3/11
� |
2008-01-09 |
|
[ 136 ]
�
� |
SIP-ISDN and SIP-SIP Network Integration Tests
�
� |
Telekom Austria TA
� |
8/11
� |
2008-01-08 |
|
[ 135 ]
�
� |
Q.1912.5 Conformance tests
�
� |
Telecom Austria TA
� |
8/11
� |
2008-01-08 |
|
[ 134 ]
�
� |
Additional call flows for Q.UNI profile
�
� |
ETRI
� |
3/11
� |
2008-01-08 |
|
[ 133 ]
�
� |
Call flows for Q.3401 Amendment A
�
� |
ETRI
� |
3/11
� |
2008-01-08 |
|
[ 132 ]
�
� |
Extensions for early media in Q.UNI profile
�
� |
ETRI
� |
3/11
� |
2008-01-08 |
|
[ 131 ]
�
� |
Extensions for early media in Q.3401 Amendment A
�
� |
ETRI
� |
3/11
� |
2008-01-08 |
|
[ 130 ]
�
� |
Proposed ToR extension for Q.7/11 in the next study period (2009 - 2012)
�
� |
ETRI
� |
7/11
� |
2008-01-08 |
|
[ 129 ]
�
� |
Appropriate range of ANM response time at inter-operator ISUP
�
� |
ETRI
� |
3/11
� |
2008-01-08 |
|
[ 128 ]
�
� |
Analysis about the difference of NACF R1 and R2
�
� |
ETRI
� |
7/11
� |
2008-01-08 |
|
[ 127 ]
�
� |
Proposal for SG11 work scope for the next study period
�
� |
Korea (Republic of)
� |
ALL/11
� |
2008-01-08 |
|
[ 126 ]
�
� |
Proposal for expanded scope to Q.2/11
�
� |
Korea (Republic of)
� |
2/11
� |
2008-01-08 |
|
[ 125 ]
�
� |
Revised texts of Draft Recommendation Q.nacp.S-TC1
�
� |
Korea (Republic of)
� |
7/11
� |
2008-01-08 |
|
[ 124 ]
�
� |
Proposal for adding new text of Q.NGN-trx.profile
�
� |
Korea (Republic of)
� |
7/11
� |
2008-01-08 |
|
[ 123 ]
�
� |
Draft Recommendation Q.nacf.auth1 "Authentication Protocols based on EAP-AKA for Interworking among 3GPP, WiMax, and WLAN in NGN"
�
� |
Korea (Republic of)
� |
7/11
� |
2008-01-08 |
|
[ 122 ]
�
� |
Proposal on the updated texts in draft Q.nacp.S-TC1
�
� |
KT
� |
7/11
� |
2008-01-08 |
|
[ 121 ]
�
� |
Proposed texts on service model for Q.CRBT_CRT
�
� |
KT
� |
2/11, 3/11
� |
2008-01-08 |
|
[ 120 ]
�
� |
Proposed texts on service description and architecture for Q.CRBT_CRT
�
� |
KT
� |
2/11, 3/11
� |
2008-01-08 |
|
[ 119 ]
�
� |
Proposed updates to TRQ.rsf
�
� |
MII, People?s Republic of China, Huawei Technologies Co., Ltd.
� |
5/11
� |
2008-01-08 |
|
[ 118 ]
�
� |
Proposed texts to Rt interface
�
� |
MII, People's Republic of China
� |
5/11
� |
2008-01-08 |
|
[ 117 ]
�
� |
Proposed texts on clause 9.3 of Rs interface
�
� |
MII, People's Republic of China
� |
5/11
� |
2008-01-08 |
|
[ 116 ]
�
� |
Propose to consent Draft Recommendation Q.NGN-trx.profile at January 2008
SG 11 Meeting
�
� |
China Telecom
� |
7/11
� |
2008-01-08 |
|
[ 115 ]
�
� |
Proposal to revise Q.2/11
�
� |
Huawei Technologies Co,. Ltd.
� |
2/11
� |
2008-01-08 |
|
[ 114 ]
�
� |
Propose for CRT service flow in IMS (download)
�
� |
Huawei Technologies Co.,Ltd.
� |
2/11, 3/11
� |
2008-01-08 |
|
[ 113 ]
�
� |
Propose for CRT service flow in IMS
�
� |
Huawei Technologies Co.,Ltd.
� |
2/11, 3/11
� |
2008-01-08 |
|
[ 112 ]
�
� |
Propose for CRBT service flow in IMS
�
� |
Huawei Technologies Co.,Ltd.
� |
2/11, 3/11
� |
2008-01-08 |
|
[ 111 ]
�
� |
Proposed texts to Q.NACF.mob0
�
� |
Huawei Technologies Co., Ltd.
� |
7/11
� |
2008-01-08 |
|
[ 110 ]
�
� |
Draft of Q.3306.1 (Q.rcp6) update
�
� |
Telekomunikacja Polska (Poland)
� |
5/11
� |
2008-01-08 |
|
[ 109 ]
�
� |
Proposed additions for handbook clauses
�
� |
Telekomunikacja Polska (Poland)
� |
6/11
� |
2008-01-08 |
|
[ 108 ]
�
� |
Proposals of new questions under study for 2009-2012 Study Period from Q.8/11 responsibilities
�
� |
Telecommunication Administration of the Russian Federation
� |
8/11
� |
2008-01-08 |
|
[ 107 ]
�
� |
Inexpediency of association of the SG11, SG13 and SG19
�
� |
Telecommunication Administration of the Russian Federation
� |
8/11
� |
2008-01-08 |
|
[ 106 ]
�
� |
Call to develop a Signalling Recommendation supporting Flow State Aware Resource Control
�
� |
Anagran Inc.
� |
5/11
� |
2008-01-07 |
|
[ 105 ]
�
� |
Considerations regarding security requirements associated with draft Recommendation Q.3304.1
�
� |
Nortel Networks (Canada)
� |
5/11
� |
2008-01-07 |
|
[ 104 ]
�
� |
Consideration of the configuration and scope of Rh reference point
�
� |
ETRI
� |
5/11
� |
2008-01-07 |
|
[ 103 ]
�
� |
Additional text to Q.3308 (Rh reference point)
�
� |
ETRI
� |
5/11
� |
2008-01-07 |
|
[ 102 ]
�
� |
The consideration of the baseline protocol for the Rh reference point
�
� |
ETRI
� |
5/11
� |
2008-01-07 |
|
[ 101 ]
�
� |
Proposed texts to Rh interface
�
� |
China Telecom, Huawei Technologies Co., Ltd.
� |
5/11, 4/13
� |
2008-01-07 |
|
[ 100 ]
�
� |
Signaling requirement for Mobility and Handover Control Function
�
� |
ETRI
� |
1/11
� |
2008-01-07 |
|
[ 99 ]
�
� |
Proposed updates to Ri interface
�
� |
China Telecom, Huawei Technologies
� |
5/11
� |
2008-01-07 |
|
[ 98 ]
�
� |
Proposed work item on use of pre-congestion notification (PCN) for resource control
�
� |
Huawei Technologies, BT
� |
5/11
� |
2008-01-07 |
|
[ 97 ]
�
� |
Proposal of creating a draft Rec. for Admission Control Coordination
�
� |
British Telecom, Huawei Technologies Co., Ltd.
� |
5/11
� |
2008-01-07 |
|
[ 96 ]
�
� |
Proposed revised text of Q.4/11 description
�
� |
NTT Comware Corporation
� |
4/11
� |
2008-01-07 |
Results:145 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):