International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG11 : Meeting�2005-05-02�: Delayed Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG11� D�(2005-05-02)�

ITU-T�SG11

Signalling requirements and protocols

Study Period 2005

Meeting� from 2005-05-02 to 2005-05-06

held in Switzerland [Geneva]

Other Meetings : 2009-01-19� 2008-09-12� 2008-09-05� 2008-01-16� 2007-09-21� 2007-04-23� 2006-11-03� 2006-07-242006-01-232005-09-05� [ 2005-05-02 ]� 2004-12-06

Results:4 total items.
Delayed Contributions �[�Source:�Korea (Republic of)�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 40 ]
Proposal to initiate a SG 11 work item to develop discovery protocol for Network Attachment Control and Signalling Requirements in NGN environment � Korea (Republic of) 7/11 2005-04-20
[ 39 ]
Proposed initiation of a Q.7/11 work item to develop Network Attachment Control and Signalling Requirements for Emerging Access Technologies � Korea (Republic of) 7/11 2005-04-20
[ 38 ]
Proposed initiation of a Q.7/11 work item to develop Network Access Security Aspect in Attachment Control and Signalling � Korea (Republic of) 7/11 2005-04-20
[ 37 ]
Proposed initiation of a Q.7/11 work item to develop Signalling Requirement and Architecture of Network Attachment Control. � Korea (Republic of) 7/11 2005-04-20
Results:4 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10