Temporary Documents
�(GEN)
�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 388-GEN ]
�
� |
Reply LS to Q1/15 on update on access network activities in SG 6
�
� |
SG6 Chairman
� |
QALL/6
� |
2008-05-06 |
|
[ 387-GEN ]
�
� |
Mandate for SG6 Study Period 2009 - 2012
�
� |
Chairman SG6
� |
QALL/6
� |
2008-04-29 |
|
[ 386-GEN ]
�
� |
Draft Report of the sixth meeting of Study Group 6 "Outside plant and related indoor installations" (Wuhan, 14-18 April 2008)
�
� |
ITU-T Study Group 6
� |
QALL/6
� |
2008-05-07 |
|
[ 385-GEN ]
�
(Rev.1)� |
SG6 restructuring discussions
�
� |
Chairman SG6
� |
QALL/6
� |
2008-04-29 |
|
[ 384-GEN ]
�
� |
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling"
�
� |
Rapporteur Q5/6
� |
Q5/6
� |
2008-04-18 |
|
[ 383-GEN ]
�
(Rev.1)� |
Draft WP 2/6 Report (Application of products)
�
� |
Chairman WP 2/6
� |
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
� |
2008-04-18 |
|
[ 382-GEN ]
�
(Rev.1)� |
Study plan of Q1/6 for the next study period
�
� |
Rapporteur Q1/6
� |
Q1/6
� |
2008-04-18 |
|
[ 381-GEN ]
�
(Rev.1)� |
Draft WP 1/6 Report (Infrastructures and Environment)
�
� |
Chairman WP 1/6
� |
Q4/6, Q3/6, Q2/6, Q1/6
� |
2008-04-18 |
|
[ 380-GEN ]
�
� |
Revised text for consent : L.18 Sheath closures for terrestrial copper telecommunication cables
�
� |
Rapporteur Q9/6
� |
Q9/6
� |
2008-04-18 |
|
[ 379-GEN ]
�
� |
Study plan of Q5/6 for the next study period
�
� |
Rapporteur Q5/6
� |
Q5/6
� |
2008-04-18 |
|
[ 378-GEN ]
�
� |
Study plan of Q7/6 for the next study period
�
� |
Rapporteur Q7/6
� |
Q7/6
� |
2008-04-18 |
|
[ 377-GEN ]
�
� |
Study plan of Q8/6 for the next study period
�
� |
Rapporteur Q8/6
� |
Q8/6
� |
2008-04-18 |
|
[ 376-GEN ]
�
� |
Study plan of Q6/6 for the next study period
�
� |
Rapporteur Q6/6
� |
Q6/6
� |
2008-04-18 |
|
[ 375-GEN ]
�
� |
LS - New recommendation for optical cabling systems in building
�
� |
IEC SC46C
� |
Q2/6
� |
2008-04-17 |
|
[ 374-GEN ]
�
(Rev.1)� |
Draft proposal for Q9 working plan for next study period
�
� |
Rapporteur Q9/6
� |
Q9/6
� |
2008-04-17 |
|
[ 373-GEN ]
�
� |
Work plan proposal for Question 4/6 for next Study Period
�
� |
Rapporteur Q4/6
� |
Q4/6
� |
2008-04-17 |
|
[ 372-GEN ]
�
(Rev.1)� |
Reply to LS on proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis
�
� |
ITU-T SG6
� |
QALL/6
� |
2008-04-17 |
|
[ 371-GEN ]
�
� |
Reply to LS on SG 5 questions for the Study Period 2009-2012
�
� |
ITU-T SG6
� |
QALL/6
� |
2008-04-17 |
|
[ 370-GEN ]
�
(Rev.1)� |
LISTE FINALE DES PARTICIPANTS - FINAL LIST OF PARTICIPANTS -
LISTA FINAL DE PARTICIPANTES
�
� |
TSB
� |
QALL/6
� |
2008-04-17 |
|
[ 369-GEN ]
�
(Rev.1)� |
Optical drop development under Brazilian conditions
�
� |
Rapporteur Q7/6
� |
Q7/6
� |
2008-04-15 |
|
[ 368-GEN ]
�
(Rev.1)� |
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198)
�
� |
Rapporteur Q2/6
� |
Q2/6
� |
2008-04-15 |
|
[ 367-GEN ]
�
� |
Preliminary Framework for further detailed Discussion of ITU-T Study Group restructuring
�
� |
Convenor, ad hoc group on restructuring
� |
QALL/6
� |
2008-04-15 |
|
[ 366-GEN ]
�
� |
Report of Teleconference on ITU-T SG Restructuring (April 2-4, 2008)
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 365-GEN ]
�
� |
Proposed wording and work plan for the next Study Period to Q.3/6 "Technical aspects of unbundling and sharing of outside plant elements in networks"
�
� |
Rapporteur Q3/6
� |
Q3/6
� |
2008-04-15 |
|
[ 364-GEN ]
�
� |
Answers to questionnaire on "Technical Aspects Related to Unbundling of Network Elements"
�
� |
Rapporteur Q3/6
� |
Q3/6
� |
2008-04-15 |
|
[ 363-GEN ]
�
� |
Status of texts under WTSA-04 Resolution 1 Procedures
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 362-GEN ]
�
� |
Initial list of Temporary Documents for Study Group 6 meeting
(Wuhan, 14-18 April 2008)
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 361-GEN ]
�
� |
Work Programme for Study Group 6
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 360-GEN ]
�
� |
List of Report(s) and Contributions for Study Group 6 meeting
(Wuhan, 14-18 April 2008)
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 359-GEN ]
�
� |
Information for the Study Group 6 Meeting
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 358-GEN ]
�
� |
Draft Agenda and Work Plan for Study Group 6 Meeting
�
� |
TSB
� |
QALL/6
� |
2008-04-15 |
|
[ 357-GEN ]
�
� |
Draft new Recommendation on "Management of poles carrying overhead telecommunications lines"
�
� |
Rapporteur Q2/6
� |
Q2/6
� |
2008-04-14 |
|
[ 356-GEN ]
�
� |
Preservation of Wooden Poles Carrying Overhead Telecommunication Lines-Rev
�
� |
Rapporteur Q 1/6
� |
Q1/6
� |
2008-04-14 |
|
[ 355-GEN ]
�
� |
Classification Outside Plant Waste-Rev
�
� |
Rapporteur Q1/6
� |
Q1/6
� |
2008-04-14 |
|
[ 354-GEN ]
�
� |
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198)
�
� |
Rapporteur Q2/6
� |
Q2/6
� |
2008-04-14 |
|
[ 353-GEN ]
�
� |
�
Document withdrawn
� |
N/A
� |
� |
2008-04-07 |
|
[ 352-GEN ]
�
� |
Liaison report of the October meeting of SC86A
�
� |
Liaison Officer for IEC SC86A
� |
Q9/6
� |
2008-04-06 |
|
[ 351-GEN ]
�
� |
IEEE OUI assignment for ITU-T
�
� |
ITU-T SG15
� |
QALL/6
� |
2008-04-04 |
|
[ 350-GEN ]
�
� |
Revision of G.650.3
�
� |
Rapporteur Q5/15
� |
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
� |
2008-04-04 |
|
[ 349-GEN ]
�
� |
Deletion of G.651
�
� |
ITU-T SG15
� |
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
� |
2008-04-04 |
|
[ 348-GEN ]
�
� |
G.Sup42 "Guide on the use of the ITU-T Recommendations related to Optical Technology"
�
� |
ITU-T SG15
� |
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
� |
2008-04-04 |
|
[ 347-GEN ]
�
� |
Reply to LS on update on access network activities in SG6
�
� |
ITU-T SG15
� |
QALL/6
� |
2008-04-04 |
|
[ 346-GEN ]
�
� |
New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan.
�
� |
ITU-T SG15
� |
QALL/6
� |
2008-04-04 |
|
[ 345-GEN ]
�
� |
Draft new Recommendation G.hnta - Generic Home Network Transport Architecture
�
� |
ITU-T SG15
� |
QALL/6
� |
2008-04-04 |
|
[ 344-GEN ]
�
� |
�
Document withdrawn
� |
N/A
� |
Q4/6
� |
2008-04-04 |
|
[ 343-GEN ]
�
(Rev.1)� |
Draft new recomm. "Operations support system requirements for infrastructure and network elements management using ID technology" (for consent)
�
� |
Rapporteur Q4/6
� |
Q4/6
� |
2008-04-03 |
|
[ 342-GEN ]
�
(Rev.1-3)� |
Draft new ITU-T Recommendation L.coacc "Test, acceptance and maintenance methods of copper subscriber pairs" (for consent)
�
� |
Rapporteur Q5/6
� |
Q5/6
� |
2008-04-03 |
|
[ 341-GEN ]
�
(Rev.1-2)� |
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling" (for consent)
�
� |
Rapporteur Q5/6
� |
Q5/6
� |
2008-04-03 |
|
[ 340-GEN ]
�
� |
Liaison on a three party query response IdM model
�
� |
JCA-IdM Co-convenors
� |
QALL/6
� |
2008-03-17 |
|
[ 339-GEN ]
�
� |
Liaison on a proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis
�
� |
JCA-IdM Co-convenors
� |
QALL/6
� |
2008-03-17 |
Results:66 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):