International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG06 : Meeting�2008-04-14�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG06� TD-GEN�(2008-04-14)�

ITU-T�SG06

Outside plant and related indoor installations

Study Period 2005

Meeting� from 2008-04-14 to 2008-04-18

held in China [Wuhan]

Other Meetings : 2009-10-12� 2008-12-01� [ 2008-04-14 ]� 2007-11-192007-05-142006-09-192005-12-122005-01-31

Results:66 total items.
Result page:� 1 - 2 �-�Next Next
Temporary Documents �(GEN) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 388-GEN ]
Reply LS to Q1/15 on update on access network activities in SG 6 � SG6 Chairman QALL/6 2008-05-06
[ 387-GEN ]
Mandate for SG6 Study Period 2009 - 2012 � Chairman SG6 QALL/6 2008-04-29
[ 386-GEN ]
Draft Report of the sixth meeting of Study Group 6 "Outside plant and related indoor installations" (Wuhan, 14-18 April 2008) � ITU-T Study Group 6 QALL/6 2008-05-07
[ 385-GEN ]
(Rev.1)
SG6 restructuring discussions � Chairman SG6 QALL/6 2008-04-29
[ 384-GEN ]
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling" � Rapporteur Q5/6 Q5/6 2008-04-18
[ 383-GEN ]
(Rev.1)
Draft WP 2/6 Report (Application of products) � Chairman WP 2/6 Q9/6, Q8/6, Q7/6, Q6/6, Q5/6 2008-04-18
[ 382-GEN ]
(Rev.1)
Study plan of Q1/6 for the next study period � Rapporteur Q1/6 Q1/6 2008-04-18
[ 381-GEN ]
(Rev.1)
Draft WP 1/6 Report (Infrastructures and Environment) � Chairman WP 1/6 Q4/6, Q3/6, Q2/6, Q1/6 2008-04-18
[ 380-GEN ]
Revised text for consent : L.18 Sheath closures for terrestrial copper telecommunication cables � Rapporteur Q9/6 Q9/6 2008-04-18
[ 379-GEN ]
Study plan of Q5/6 for the next study period � Rapporteur Q5/6 Q5/6 2008-04-18
[ 378-GEN ]
Study plan of Q7/6 for the next study period � Rapporteur Q7/6 Q7/6 2008-04-18
[ 377-GEN ]
Study plan of Q8/6 for the next study period � Rapporteur Q8/6 Q8/6 2008-04-18
[ 376-GEN ]
Study plan of Q6/6 for the next study period � Rapporteur Q6/6 Q6/6 2008-04-18
[ 375-GEN ]
LS - New recommendation for optical cabling systems in building � IEC SC46C Q2/6 2008-04-17
[ 374-GEN ]
(Rev.1)
Draft proposal for Q9 working plan for next study period � Rapporteur Q9/6 Q9/6 2008-04-17
[ 373-GEN ]
Work plan proposal for Question 4/6 for next Study Period � Rapporteur Q4/6 Q4/6 2008-04-17
[ 372-GEN ]
(Rev.1)
Reply to LS on proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis � ITU-T SG6 QALL/6 2008-04-17
[ 371-GEN ]
Reply to LS on SG 5 questions for the Study Period 2009-2012 � ITU-T SG6 QALL/6 2008-04-17
[ 370-GEN ]
(Rev.1)
LISTE FINALE DES PARTICIPANTS - FINAL LIST OF PARTICIPANTS - LISTA FINAL DE PARTICIPANTES � TSB QALL/6 2008-04-17
[ 369-GEN ]
(Rev.1)
Optical drop development under Brazilian conditions � Rapporteur Q7/6 Q7/6 2008-04-15
[ 368-GEN ]
(Rev.1)
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198) � Rapporteur Q2/6 Q2/6 2008-04-15
[ 367-GEN ]
Preliminary Framework for further detailed Discussion of ITU-T Study Group restructuring � Convenor, ad hoc group on restructuring QALL/6 2008-04-15
[ 366-GEN ]
Report of Teleconference on ITU-T SG Restructuring (April 2-4, 2008) � TSB QALL/6 2008-04-15
[ 365-GEN ]
Proposed wording and work plan for the next Study Period to Q.3/6 "Technical aspects of unbundling and sharing of outside plant elements in networks" � Rapporteur Q3/6 Q3/6 2008-04-15
[ 364-GEN ]
Answers to questionnaire on "Technical Aspects Related to Unbundling of Network Elements" � Rapporteur Q3/6 Q3/6 2008-04-15
[ 363-GEN ]
Status of texts under WTSA-04 Resolution 1 Procedures � TSB QALL/6 2008-04-15
[ 362-GEN ]
Initial list of Temporary Documents for Study Group 6 meeting (Wuhan, 14-18 April 2008) � TSB QALL/6 2008-04-15
[ 361-GEN ]
Work Programme for Study Group 6 � TSB QALL/6 2008-04-15
[ 360-GEN ]
List of Report(s) and Contributions for Study Group 6 meeting (Wuhan, 14-18 April 2008) � TSB QALL/6 2008-04-15
[ 359-GEN ]
Information for the Study Group 6 Meeting � TSB QALL/6 2008-04-15
[ 358-GEN ]
Draft Agenda and Work Plan for Study Group 6 Meeting � TSB QALL/6 2008-04-15
[ 357-GEN ]
Draft new Recommendation on "Management of poles carrying overhead telecommunications lines" � Rapporteur Q2/6 Q2/6 2008-04-14
[ 356-GEN ]
Preservation of Wooden Poles Carrying Overhead Telecommunication Lines-Rev � Rapporteur Q 1/6 Q1/6 2008-04-14
[ 355-GEN ]
Classification Outside Plant Waste-Rev � Rapporteur Q1/6 Q1/6 2008-04-14
[ 354-GEN ]
Answers to the Questionnaire on Korean experience on access network installation procedures (TSB Circular 198) � Rapporteur Q2/6 Q2/6 2008-04-14
[ 353-GEN ]

Document withdrawn
N/A � 2008-04-07
[ 352-GEN ]
Liaison report of the October meeting of SC86A � Liaison Officer for IEC SC86A Q9/6 2008-04-06
[ 351-GEN ]
IEEE OUI assignment for ITU-T � ITU-T SG15 QALL/6 2008-04-04
[ 350-GEN ]
Revision of G.650.3 � Rapporteur Q5/15 Q9/6, Q8/6, Q7/6, Q6/6, Q5/6 2008-04-04
[ 349-GEN ]
Deletion of G.651 � ITU-T SG15 Q9/6, Q8/6, Q7/6, Q6/6, Q5/6 2008-04-04
[ 348-GEN ]
G.Sup42 "Guide on the use of the ITU-T Recommendations related to Optical Technology" � ITU-T SG15 Q9/6, Q8/6, Q7/6, Q6/6, Q5/6 2008-04-04
[ 347-GEN ]
Reply to LS on update on access network activities in SG6 � ITU-T SG15 QALL/6 2008-04-04
[ 346-GEN ]
New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan. � ITU-T SG15 QALL/6 2008-04-04
[ 345-GEN ]
Draft new Recommendation G.hnta - Generic Home Network Transport Architecture � ITU-T SG15 QALL/6 2008-04-04
[ 344-GEN ]

Document withdrawn
N/A � Q4/6 2008-04-04
[ 343-GEN ]
(Rev.1)
Draft new recomm. "Operations support system requirements for infrastructure and network elements management using ID technology" (for consent) � Rapporteur Q4/6 Q4/6 2008-04-03
[ 342-GEN ]
(Rev.1-3)
Draft new ITU-T Recommendation L.coacc "Test, acceptance and maintenance methods of copper subscriber pairs" (for consent) � Rapporteur Q5/6 Q5/6 2008-04-03
[ 341-GEN ]
(Rev.1-2)
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling" (for consent) � Rapporteur Q5/6 Q5/6 2008-04-03
[ 340-GEN ]
Liaison on a three party query response IdM model � JCA-IdM Co-convenors QALL/6 2008-03-17
[ 339-GEN ]
Liaison on a proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis � JCA-IdM Co-convenors QALL/6 2008-03-17
Results:66 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4