International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG04 : Meeting�2007-08-28�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG04� TD-WP2�(2007-08-28)�

ITU-T�SG04

Telecommunication management capabilities

Study Period 2005

Meeting� from 2007-08-28 to 2007-09-07

held in Switzerland [Geneva]

Other Meetings : 2009-11-17� 2009-03-242008-05-13� [ 2007-08-28 ]� 2007-02-052006-05-242005-09-202005-07-292005-02-15

Results:20 total items.
Temporary Documents �(WP2) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 77-WP2 ]
Meeting Report SWP 12/4 - Telecommunications management and OAM project plan � Rapporteur, Question 12/4 Q12/4 2007-09-05
[ 76-WP2 ]
Outgoing Liaison Statement - SG 4 Report and Request in its role as Lead SG on Telecommunication Management2 � ITU-T SG4 Q12/4 2007-09-05
[ 75-WP2 ]
New text for Question 12/4 - Telecommunications management and OAM project plan � Rapporteur Question 12/4 Q12/4 2007-09-05
[ 74-WP2 ]
About Customer Experience Management � Acting Rapporteur, Q6/4 Q6/4 2007-09-05
[ 73-WP2 ]
(Rev.1)
Draft "NGNM Requirements Analysis and Traceability", version 8 � Rapporteur, Question 8/4 Q8/4 2007-09-04
[ 72-WP2 ]
Proposed Terms of Reference v6.0 for the NGN Management Focus Group � Rapporteur, Q8/4 Q8/4 2007-09-04
[ 71-WP2 ]
About Future Common Telecom Management Framework � Acting Rapporteur, Question 6/4 Q6/4 2007-09-03
[ 70-WP2 ]
Analysis of Y.2012 (clauses 7.4 and 8.5) for RAT � Editor Q8/4 2007-08-30
[ 69-WP2 ]
Analysis of Y.2201 (clauses 5.9.6, 5.17, 5.20) for RAT � Editor Q8/4 2007-08-30
[ 68-WP2 ]
Proposed revised text of ITU-T Recommendation E.480(Rev.2) � Rapporteur, Question 8/4 Q8/4 2007-08-29
[ 67-WP2 ]
(Rev.1)
Draft Rec. E.41NGN&S � Rapporteur, Question 8/4 Q8/4 2007-08-29
[ 66-WP2 ]
Draft "NGNM Requirements Analysis and Traceability", version 7 � Rapporteur, Question 8/4 Q8/4 2007-08-29
[ 65-WP2 ]
(Rev.1)
Telecommunications management and OAM project (September 2007) � Rapporteur, Question 12/4 Q12/4 2007-08-29
[ 64-WP2 ]
(Rev.1-2)
Agenda for Question 12/4 - Telecommunications management and OAM project plan � Rapporteur, Question 12/4 Q12/4 2007-08-29
[ 63-WP2 ]
(Rev.1)
Q6/4 Draft Agenda � Acting Rapporteur, Question 6/4 Q6/4 2007-08-28
[ 62-WP2 ]
(Rev.1-2)
Draft Agenda for SWP 7/4 meeting � Rapporteur, Question 7/4 Q7/4 2007-08-27
[ 61-WP2 ]
ITU-T Recommendation (draft) M.3344: Requirements and Analysis for NGN Appointement Management across B2B and C2B interface � Editor Rec. M.3344 Q7/4 2007-08-22
[ 60-WP2 ]
ITU-T Recommendation (draft) M.3340: B2B/C2B Interface Framework for NGN Service Assurance � Editor Rec. M.3340 Q7/4 2007-08-22
[ 59-WP2 ]
WP2/4 Draft Agenda � Chairman, WP2/4 Q8/4, Q7/4, Q6/4, Q12/4 2007-08-17
[ 58-WP2 ]
(Rev.1-4)
Agenda for SWP 8/4 � Rapporteur, Question 8/4 Q8/4 2007-08-16
Results:20 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-28