Temporary Documents
�(WP2)
�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 26-WP2 ]
�
� |
Draft discussion summary of Q8/11 meetings on 4-5 March 2004
�
� |
WP 2/11 Chairman (G. Ratta)
� |
Q8/11
� |
2004-03-05 |
|
[ 25-WP2 ]
�
� |
BICC CS3 Overall Requirements (Restructured)
�
� |
Editor (D. Knight)
� |
Q9/11
� |
2004-03-04 |
|
[ 24-WP2 ]
�
� |
Draft BICC CS3 Requirement Flows (Draft TRQ.BICC.CS3.flows)
�
� |
Editor (I. Rytina)
� |
Q9/11
� |
2004-03-03 |
|
[ 23-WP2 ]
�
� |
BICC CS3 overall Requirements (output)
�
� |
Editor (D. Knight)
� |
Q9/11
� |
2004-03-03 |
|
[ 22-WP2 ]
�
� |
Q9/11 meeting report
�
� |
Rapporteur (L. Graf)
� |
Q9/11
� |
2004-03-02 |
|
[ 21-WP2 ]
�
(Rev.1)� |
Draft Signalling Requirements to support IP telephony (INPUT)
�
� |
Rapporteur (K. Kenyoshi)
� |
Q7/11
� |
2004-03-01 |
|
[ 20-WP2 ]
�
� |
Proposed Agenda of Q.7/11 (SWP2-2)
�
� |
Rapporteur (K. Kenyoshi)
� |
Q7/11
� |
2004-03-01 |
|
[ 19-WP2 ]
�
� |
Proposed Agenda for Q8/11 Discussions
�
� |
WP2/11 Chairman (G. Ratta)
� |
Q8/11
� |
2004-02-29 |
|
[ 18-WP2 ]
�
(Rev.1)� |
Meeting agenda, document allocation and schedule.
�
� |
Rapporteur (L. Graf)
� |
Q9/11
� |
2004-02-26 |
|
[ 17-WP2 ]
�
(Rev.1)� |
Q6/11 Agenda
�
� |
Q6/11 Rapporteur (K. Mainwaring)
� |
Q6/11
� |
2004-02-25 |
|
[ 16-WP2 ]
�
(Rev.1-2)� |
Technical Report TRQ.NSIP Syntax Requirements For Carrying Narrowband Signalling Information Within IP-Based Signalling Systems
�
� |
Editor (T. Fu)
� |
Q6/11
� |
2004-02-24 |
|
[ 15-WP2 ]
�
� |
Reply to Proposal on control plane interworking between FR and MPLS
�
� |
SG 17 (GVA, 10-19 Sept. 2003)
� |
Q5/17, Q8/11
� |
2003-10-07 |
|
[ 14-WP2 ]
�
(Rev.1)� |
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS
�
� |
Editor pro tem (G. Ratta)
� |
Q9/11, Q8/11, Q7/11
� |
2004-02-23 |
|
[ 13-WP2 ]
�
(Rev.1)� |
WP 2/11 Work Programme
�
� |
WP2/11 Vice-Chairman (D. Knight)
� |
Q9/11, Q8/11, Q7/11, Q6/11
� |
2004-02-21 |
|
[ 12-WP2 ]
�
� |
BICC CS3 Overall Requirements (input)
�
� |
Editor, TRQ.BICC.CS3.GEN (D. Knight)
� |
Q9/11
� |
2004-02-19 |
|
[ 11-WP2 ]
�
� |
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol
�
� |
Editor (R. Jesske)
� |
Q9/11, Q6/11
� |
2004-02-18 |
|
[ 10-WP2 ]
�
� |
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol
�
� |
Editor (R. Jesske)
� |
Q9/11, Q6/11
� |
2004-02-18 |
|
[ 9-WP2 ]
�
(Rev.1)� |
Draft new Recommendation Y.e2eqos on an end-to-end QoS architecture for IP networks evolving into the NGN
�
R1 submitted by SG13 on 20.02.04 in replacement of TD 9-2/11
� |
SG13 (GVA 3-12 February 2004)
� |
Q16/13, Q8/11
� |
2004-02-17 |
|
[ 8-WP2 ]
�
� |
Liaison Statement - QoS signalling requirements pertaining to the draft new Recommendation Y.123.qos on a Qos architecture for Ethernet-based access networks
�
� |
SG13 (GVA 3-12 February 2004)
� |
Q16/13, Q8/11
� |
2004-02-17 |
|
[ 7-WP2 ]
�
� |
Reply LS to SG 11 on Signalling Requirements for IP-QoS
�
� |
SG 16 ( GVA 20-30 January 2004)
� |
QF/16, Q8/11
� |
2004-02-05 |
|
[ 6-WP2 ]
�
� |
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony
�
� |
SG 9 (Honolulu, 15-21 January 2004)
� |
Q13/9, Q12/9, Q10/9, Q7/11
� |
2004-02-04 |
|
[ 5-WP2 ]
�
� |
Liaison Statement - Update on QoS Lead Study Group activities
�
� |
SG12 (GVA 30.09.03)
� |
Q15/12, Q8/11
� |
2003-10-10 |
|
[ 4-WP2 ]
�
� |
Liaison Statement - Response to liaison on Draft Signalling Requirements to Support "IP Telephony"
�
� |
ETSI TISPAN (TIPHON) 1-5 Dec. 2003
� |
Q7/11
� |
2003-12-11 |
|
[ 3-WP2 ]
�
� |
Liaison Statement - Revised Recommendation G.114
�
� |
SG12 (GVA 30.09.03)
� |
Q10/12, Q8/11
� |
2003-10-10 |
|
[ 2-WP2 ]
�
� |
List of WP2/11 Series Temporary Documents
�
� |
TSB
� |
Q9/11, Q8/11, Q7/11, Q6/11
� |
2004-02-27 |
|
[ 1-WP2 ]
�
� |
Agenda - WP2/11 Plenary Sessions
�
To be provided
� |
N/A
� |
� |
N/A |
Results:26 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):