Temporary Documents
�(WP2)
�[�AI/Question:�9/11�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 44-WP2 ]
�
� |
Report of the Q8/11 and joint Q 8 & 9/11 meetings
�
� |
Rapporteur (R. Schumacher)
� |
Q8/11, Q9/11
� |
2002-11-20 |
|
[ 42-WP2 ]
�
(Rev.1)� |
Liaison Statements Generated by Questions in WP2/11
�
� |
WP2/11 Vice Chairman (D. Knight)
� |
Q6/11, Q7/11, Q8/11, Q9/11
� |
2002-11-20 |
|
[ 41-WP2 ]
�
� |
Report of joint Qs6/11 and 9/11 and joint Qs 6/11 and 7/11 discussions
�
� |
Q6/11 Rapporteur (K. Mainwaring)
� |
Q6/11, Q7/11, Q9/11
� |
2002-11-19 |
|
[ 39-WP2 ]
�
(Rev.1)� |
Report of the Question 9/11 Meeting
�
� |
Temporary Rapporteur (D. Knight)
� |
Q9/11
� |
2002-11-20 |
|
[ 36-WP2 ]
�
� |
Technical Report TRQ.NSIP Signalling Requirements for Carrying Narrowband Service Signalling Information within IP-Based Signalling Systems to Support Interworking of Services
�
� |
Editor (T. Fu)
� |
Q6/11, Q9/11
� |
2002-11-14 |
|
[ 35-WP2 ]
�
� |
Agenda for the Question 9/11 Meeting
�
� |
Temporary Rapporteur (D. Knight)
� |
Q9/11
� |
2002-11-12 |
|
[ 32-WP2 ]
�
(Rev.1)� |
Agenda of Q6/11 and joint Qs 6 & 9/11
�
� |
Q.6/11 Rapporteur (K.Mainwaring)
� |
Q6/11, Q9/11
� |
2002-11-12 |
|
[ 23-WP2 ]
�
� |
Liaison Statement to SGs 11, 2 & 16 - Draft Recommendation Y.1530 (November 2002)
�
� |
SG13 (GVA 29 Oct - 8 Nov 2002)
� |
Q5/2, Q6/11, Q6/2, Q7/11, Q8/11, Q9/11, Q9/13, QF/16
� |
2002-11-08 |
|
[ 21-WP2 ]
�
(Rev.1)� |
TRQ.IPBCP.CS2: Requirements for Capability Set 2 of the IP Bearer Control Protocol (Input)
�
� |
Editor (D. Knight)
� |
Q9/11
� |
2002-11-19 |
|
[ 20-WP2 ]
�
� |
Report of the Newbury Interim Joint Q.6/11 & 9/11 Meeting (17-21 June 2002)
�
� |
Rapporteur Q6/11 (K. Mainwaring)
� |
Q6/11, Q9/11
� |
2002-11-05 |
|
[ 19-WP2 ]
�
� |
Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw), Editor's Input
�
� |
Editor (B. Pfeil)
� |
Q9/11
� |
2002-10-30 |
|
[ 18-WP2 ]
�
� |
Agreed Ottawa output of Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw)
�
� |
Editor (B. Pfeil)
� |
Q9/11
� |
2002-10-30 |
|
[ 16-WP2 ]
�
� |
Draft Technical Report TRQ.IPC.CS1 (Signalling Requirements for IP Connection Control in Radio Access Networks Capability Set 1)
�
� |
Editor (L. Graf)
� |
Q9/11
� |
2002-10-18 |
|
[ 15-WP2 ]
�
� |
Draft Technical Report TRQ.AAL2.CS3 (Signalling Requirements for AAL Type 2 Signalling Capability Set 3)
�
� |
Editor (L. Graf)
� |
Q9/11
� |
2002-10-18 |
|
[ 14-WP2 ]
�
� |
Liaison Statement to SGs 2,11,12, &13 - Comments on Draft Recommendation E.QSC
�
� |
QF Rapprtr. meeting (Bruges 24-28.06.02)
� |
Q8/11, Q9/11, QF/16
� |
2002-07-19 |
|
[ 13-WP2 ]
�
� |
Liaison Statement to SGs 11,12 & 13 - Comments on generic end-to-end QoS service requirements
�
� |
Q.F Rapprt meeting, Bruges (24-28.6.02)
� |
Q8/11, Q9/11, QF/16
� |
2002-07-19 |
|
[ 12-WP2 ]
�
� |
Liaison reply to SG 13 and SG 11 concerning joint activity on generic requirements for end-to-end QoS including the appropriate protocol mechanism for service control and signalling
�
� |
SG9 (GVA 3-7 JUNE 2002)
� |
Q13/9, Q8/11, Q9/11
� |
2002-06-27 |
|
[ 11-WP2 ]
�
� |
Liaison Statement - Comments on liaison on generic end-to-end QoS service requirements
�
� |
SG12 (GVA 27-31 MAY 2002)
� |
Q13/12, Q8/11, Q9/11
� |
2002-06-03 |
|
[ 10-WP2 ]
�
� |
Liaison Statement to ITU-T SGs 2,9,11,12,13,15,16 & 17 and ITU-R WP9A - Consent on Draft New Recommendation M.2301 (ex-M-23ip)
�
� |
SG 4 (GVA 8-19 APR. 2002)
� |
6/11, 8/11, 9/11
� |
2002-10-28 |
|
[ 9-WP2 ]
�
(Rev.2)� |
Liaison Statement to SGs 11,12,13,16 & SSG - Response to SG 11 on proposed joint activity on a generic protocol mechanism for end-to-end QoS service control and signalling protocol development based on IP transfer capabilities and IP QoS classes
�
� |
SG9 (GVA 3-7 DEC. 2002)
� |
Q10/9, Q13/9, Q8/11, Q9/11
� |
2002-04-09 |
|
[ 7-WP2 ]
�
� |
Liaison Statement to ITU-T SGs 4, 6, 9, 11, 13, 16, 17 & ITU-R SGs 4, 8 &9 - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
�
� |
SG15 (GVA 29.04.02 -10.05.02)
� |
Q9/11, QALL/15
� |
2002-05-17 |
|
[ 1-WP2 ]
�
� |
Proposed Opening WP2/11 Plenary Agenda
�
� |
WP2/11 Chairperson (G. Ratta)
� |
Q6/11, Q7/11, Q8/11, Q9/11
� |
2002-11-07 |
Results:22 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):