International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG11 : Meeting�2002-02-18�: Delayed Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG11� D�(2002-02-18)�

ITU-T�SG11

Signalling requirements and protocols

Study Period 2001

Meeting� from 2002-02-18 to 2002-03-01

held in Switzerland [Geneva]

Other Meetings : 2004-03-012003-09-012002-11-11� [ 2002-02-18 ]� 2001-07-022001-05-14� 2001-03-21� 2000-11-27

Results:5 total items.
Delayed Contributions �[�Source:�Nortel Networks (UK)�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 286 ]
Proposed Changes to Q.1902.6 to clarify bearer redirection enhancements first proposed (and accepted) in Gra-094 � Nortel Networks (UK) Q11/11 2002-02-06
[ 285 ]
Inter working of ISUP Parameter Compatibility Information with SIP networks � Nortel Networks (UK) Q11/11 2002-02-06
[ 284 ]
Specification of COLP/COLR inter working service annex. � Nortel Networks (UK) Q12/11, Q11/11 2002-02-06
[ 283 ]
Proposed Annex C.1 "Inter working of CLIP/CLIR supplementary services with SIP networks � Nortel Networks (UK) Q12/11, Q11/11 2002-02-06
[ 282 ]
Modifications to Basic call ISUP/SIP and SIP/ISUP interworking to support Calling Party Number � Nortel Networks (UK) Q12/11, Q11/11 2002-02-06
Results:5 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4