International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP7C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP7C� C�

ITU-R�R23-WP7C

Remote Sensing Systems

Results:177 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 177 ]
Reply liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials � WP 5C AI1.18 2024-12-13
[ 176 ]
Reply liaison statement to Working Party 7C - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.17 � WP 5C AI1.17 2024-12-13
[ 175 ]
Reply liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.19 � WP 5A AI1.19 2024-12-12
[ 174 ]
Liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.17 � WP 5A AI1.17 2024-12-12
[ 173 ]
Liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.18 � WP 5A AI1.18 2024-12-12
[ 172 ]
Liaison statement to ITU-R Working Party 7C (copy to ICAO for information) - Technical parameters of Wireless Avionics Intra Communications (WAIC) operating in the 4 200-4 400 MHz frequency band to consider under WRC-27 agenda item 1.19 � WP 5B AI1.19 2024-11-29
[ 171 ]
Liaison statement to Working Party 7C - Coexistence study between EESS (active) and radiolocation � WP 5B 2024-11-27
[ 170 ]
Reply liaison statement to Working Party 7C - Preliminary draft new Report ITU-R M.[FOD_EESS_SHARE] � WP 5B 2024-11-27
[ 169 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-11-18
[ 168 ]
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-11-18
[ 167 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � WP 6A AI1.17 2024-11-18
[ 166 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10 � WP 4C AI1.10 2024-11-12
[ 165 ]
Reply liaison statement to Working Parties 7C and 7D on agenda item 1.18 - WRC-27 agenda item 1.18 � WP 4A AI1.18 2024-11-08
[ 164 ]
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.4 � WP 4A AI1.4 2024-11-08
[ 163 ]
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1 � WP 4A AI1.1 2024-11-07
[ 162 ]
Reply liaison statement to Working Party 5B (copy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8 � WP 4C AI1.8 2024-10-22
[ 161 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11 � WP 4C AI1.11 2024-10-22
[ 160 ]
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-10-22
[ 159 ]
Reply liaison statement to Working Party 7C - RNSS-related comments on preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS] � WP 4C 2024-10-21
[ 158 ]
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.19 � WP 5D AI1.19 2024-10-15
[ 157 ]
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.17 � WP 5D AI1.17 2024-10-15
[ 156 ]
Liaison statement to Working Party 7C on WRC-27 agenda item 1.17 � WP 7B AI1.17 2024-10-08
[ 155 ]
Liaison statement to Working Party 7C on WRC-27 agenda item 1.19 � WP 7B AI1.19 2024-10-08
[ 154 ]
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 153 ]
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 152 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT) � WP 7D 2024-09-30
[ 151 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3 � WP 7D AI1.3 2024-09-30
[ 150 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7 � WP 7D AI1.7 2024-09-30
[ 149 ]
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) � WP 7B AI1.7 2024-09-30
[ 148 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10 � WP 7D AI1.10 2024-09-30
[ 147 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 7D AI1.15 2024-09-30
[ 146 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8 � WP 7D AI1.8 2024-09-27
[ 145 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1 � WP 7D AI1.1 2024-09-27
[ 144 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13 � WP 7D AI1.13, AI1.12 2024-09-27
[ 143 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11 � WP 7D AI1.11 2024-09-27
[ 142 ]
+Ann.1-30
Report of the meeting of Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024) � Acting Chair, WP 7C 2024-09-27
[ 141 ]
Final list of participants - Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024) � Director, BR 2024-09-27
[ 140 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications � WP 7A AI1.15 2024-09-23
[ 139 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz � WP 7A AI1.2 2024-09-20
[ 138 ]
Reply liaison statement to Working Party 7C - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.19 on possible allocations to the EESS (passive) in the 4 and 8 GHz bands � WP 7A 2024-09-21
[ 137 ]
List of documents issued (Documents 7C/41 - 7C/137) � BR, Study Groups Department 2024-09-17
[ 136 ]
Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections � Institute of Electrical and Electronics Engineers, Inc. (IEEE) 2024-09-06
[ 135 ]
Characteristics of EESS (passive) sensors above 86 GHz � European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites AI1.8 2024-09-06
[ 134 ]
Proposal towards a preliminary draft new Report on WRC-27 agenda item 1.18 (resolves 1) � European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites AI1.18 2024-09-06
[ 133 ]
Preliminary draft new Report ITU-R RS series analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections � European Space Agency (ESA) 2024-09-06
[ 132 ]
Working document towards preliminary draft revised Recommendation ITU-R RS.577-7 � European Space Agency (ESA) 2024-09-06
[ 131 ]
Revision of Recommendation ITU-R RS.515 � European Space Agency (ESA) 2024-09-06
[ 130 ]
Working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather) � Germany AI1.17 2024-09-06
[ 129 ]
Preliminary draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range � Germany 2024-09-06
[ 128 ]
Proposed draft CPM text for WRC-27 agenda item 1.17 � France AI1.17 2024-09-06
Results:177 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-13