International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP5D� C�

ITU-R�R23-WP5D

IMT Systems

Results:4 total items.
Contributions �[�Source:�Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))�]���Documents / Contributions

Number
Title Source Date
[ 216 ]
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - Security and resilience � Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) 2024-06-12
[ 215 ]
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - AI-related capacity � Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) 2024-06-12
[ 134 ]
Considerations on capabilities towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] � Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) 2024-06-03
[ 133 ]
Proposal of test environment for IMT-2030 � Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) 2024-06-03
Results:4 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9