Contributions
�[�Source:�Director, BR�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 348 ]
�
� |
Information on characteristics of FSS and MSS networks or systems as currently contained in BR IFIC required for studies under WRC-27 agenda item 1.10
�
� |
Director, BR
� |
AI1.10
� |
2024-11-26 |
|
[ 342 ]
�
� |
Final list of participants - Working Party 4A (Geneva, 21-31 October 2024)
�
� |
Director, BR
� |
� |
2024-11-01 |
|
[ 315 ]
�
� |
Statistics and information on satellite networks related to Resolution 35 (Rev.WRC-23)
�
� |
Director, BR
� |
� |
2024-10-10 |
|
[ 314 ]
�
� |
Generation of a coverage diagram that represents the smallest area encompassing the associated service area of the satellite networks under RR Appendices 30A or 30B and Resolution 170 (Rev.WRC-23)
�
� |
Director, BR
� |
� |
2024-10-10 |
|
[ 251 ]
�
� |
GSO FSS/BSS reference links used in ITU-R studies in 1995-2000 to derive the existing RR Article 22 epfd limits
�
� |
Director, BR
� |
� |
2024-10-09 |
|
[ 250 ]
�
� |
Analysis of space frequency assignments recorded under RR No. 11.41
�
� |
Director, BR
� |
� |
2024-10-09 |
|
[ 221 ]
�
(Rev.1)� |
Statistics and information on FSS networks in Region 2 sharing the 11.7-12.2 GHz frequency band with the BSS plan in Regions 1 and 3
�
� |
Director, BR
� |
� |
2024-10-08 |
|
[ 220 ]
�
� |
Issues from report of the Director to WRC-23 relevant to Appendices 30, 30A and 30B of the Radio Regulations
�
� |
Director, BR
� |
� |
2024-10-08 |
|
[ 127 ]
�
� |
Final list of participants - Working Party 4A (Geneva, 1-9 May 2024)
�
� |
Director, BR
� |
� |
2024-05-09 |
|
[ 121 ]
�
� |
Methodology to assess the change in interference environment in relation to RR No. 9.12 in working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1
�
� |
Director, BR
� |
� |
2024-04-23 |
|
[ 2 ]
�
� |
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
�
� |
Director, BR
� |
� |
2024-01-30 |
Results:11 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):