International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4A� C�

ITU-R�R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:15 total items.
Contributions �[�AI/Question:�AI1.3�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 351 ]
Liaison statement to Working Party 4A - WRC-27 agenda item 1.3 � WP 5A AI1.3 2024-12-11
[ 308 ]
MEO Earth station parameters for studies to be conducted under WRC-27 agenda item 1.3 � Intelsat AI1.3 2024-10-09
[ 281 ]
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) � United States AI1.3 2024-10-09
[ 280 ]
Proposed draft CPM text for WRC-27 agenda item 1.3 � Egypt AI1.3 2024-10-09
[ 276 ]
Proposed modifications to the working document regarding WRC-27 agenda item 1.3 � Egypt AI1.3 2024-10-09
[ 269 ]
Technical comments on Resolution 770 (Rev.WRC-23) methodology for protection of GSO networks from non-GSO interference � Viasat, Inc. AI1.3, AI1.1 2024-10-08
[ 201 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3 � WP 7D AI1.3 2024-09-30
[ 149 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3 � WP 3M AI1.3 2024-06-12
[ 134 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3 � WP 5C AI1.3 2024-05-29
[ 81 ]
Proposed working document on WRC-27 agenda item 1.3 � Canada AI1.3 2024-04-18
[ 59 ]
Draft liaison statement to Working Parties 5A, 5C, 7C and 7D (copy to Working Party 3M) - WRC-27 agenda item 1.3 � United States AI1.3 2024-04-18
[ 58 ]
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) � United States AI1.3 2024-04-18
[ 39 ]
(Rev.1)
Considerations on preparations for WRC-27 agenda item 1.3 � China AI1.3 2024-04-17
[ 35 ]
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3 � SES AI1.3 2024-04-16
[ 12 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3 � WP 7C AI1.3 2024-03-25
Results:15 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23