International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4A� C�

ITU-R�R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:18 total items.
Contributions �[�AI/Question:�AI1.2�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 355 ]
Liaison statement to Working Party 4A - Relevant technical information to support studies under WRC-27 agenda item 1.2 � WP 5A AI1.2 2024-12-11
[ 324 ]
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) � France AI1.2 2024-10-09
[ 296 ]
Proposed updates to Annex 4 to Working Party 4A Chair's Report - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) � Canada AI1.2 2024-10-08
[ 289 ]
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2 � Papua New Guinea , India , Indonesia , Thailand AI1.2 2024-10-09
[ 288 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) � Papua New Guinea AI1.2 2024-10-09
[ 279 ]
Proposed draft CPM text for WRC-27 agenda item 1.2 � Egypt AI1.2 2024-10-09
[ 240 ]
Reply liaison statement to Working Party 4A (copy to Working Party 5B) - Characteristics of space research service systems operating in the 13.75-14.0 GHz band � WP 7B AI1.2 2024-10-08
[ 226 ]
Proposed revisions to working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) � United States AI1.2 2024-10-08
[ 223 ]
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range � Ghana AI1.2 2024-10-07
[ 194 ]
Proposal on the studies under WRC-27 agenda item 1.2 � China AI1.2 2024-09-27
[ 160 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz � WP 7A AI1.2 2024-09-20
[ 152 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2 � WP 3M AI1.2 2024-06-12
[ 131 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.2 � WP 5B AI1.2 2024-05-21
[ 111 ]
GSOA position and proposals regarding studies under WRC-27 agenda item 1.2 � GSOA AI1.2 2024-04-19
[ 97 ]
Initial elements related to the preparatory work for WRC-27 agenda item 1.2 � France AI1.2 2024-04-19
[ 68 ]
Proposed working document on WRC-27 agenda item 1.2 � Ghana , Nigeria AI1.2 2024-04-18
[ 67 ]
Workplan for WRC-27 agenda item 1.2 � Ghana , Nigeria AI1.2 2024-04-18
[ 38 ]
Proposal on the studies under WRC-27 agenda item 1.2 � China AI1.2 2024-04-17
Results:18 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9