International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP6C : Contributions : 295 Recently posted�-� Search Meeting Documents
[295]� Report of the meeting of Working Party 6C (Geneva, 28 August - 1 September 2023)

Format

Size

Posted

English

Word

10403072 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.1 - Working document towards a preliminary draft new Report ITU-R BT.[ERTIP] - Display energy reduction through image signal processing

Word

91627 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.2 - Working document towards a preliminary draft new Recommendation ITU-R BT.[CARE] - A framework for content-adaptive methods for reduction of energy consumption in television displays

Word

34598 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.3 - Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) - Results of the second meeting of the FG-MV and approval of its first deliverable

Word

38209 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.4 - Reply liaison statement to ITU-T Study Group 9 - Draft new ITU-T Technical Report JSTR.LCAP "Technical advances, challenges, and best practices in live captioning"

Word

58913 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.5 - Reply liaison to ITU-T Study Group 5 - Practical examples of actions to realize energy aware broadcasting

Word

40085 bytes 2023-09-08 [295]�Chapter 5 - Annex 5.6 - Continuation of the Rapporteur Group - Energy Aware Broadcasting (RG-EAB)

Word

42770 bytes 2023-09-07 [295]�Chapter 4 - Annex 4.1 - Proposed draft reply liaison statement to ITU-T JCA-ML - Invitation to provide inputs to the "machine learning standardization roadmap" and "glossary of terms and definitions for machine learning"

Word

38241 bytes 2023-09-07 [295]�Chapter 4 - Annex 4.2 - Liaison statement to ITU-T Study Group 16 - F.IPTV-VRSREQS "Requirements of enabling VR service based on IPTV Architecture" (new): output draft (Geneva, 10-21 July 2023)

Word

40285 bytes 2023-09-11 [295]�Chapter 4 - Annex 4.3 - Reply liaison statement to the Chairman of ITU-T JCA-ML - Working Party 6C representative in ITU-T JCA-ML

Word

42814 bytes 2023-09-11 [295]�Chapter 4 - Annex 4.4 - Establishment of a Rapporteur Group on advanced media systems in broadcasting (RG-AMS)

Word

44949 bytes 2023-09-04 [295]�Chapter 3 - Annex 3.1 - Working document towards a preliminary draft revision of Recommendation ITU-R BT.2100-2 - Image parameter values for high dynamic range television for use in production and international programme exchange

Word

149867 bytes 2023-09-05 [295]�Chapter 3 - Annex 3.2 - Working document towards a preliminary draft new Recommendation ITU-R BT.[REQ-MIL] - Requirements and applications for Image Level meters

Word

1259526 bytes 2023-09-05 [295]�Chapter 3 - Annex 3.3 - Working document towards a preliminary draft new Recommendation ITU-R BT.[MON] - [Reference] viewing conditions for HDR and SDR monitoring in close proximity within a single-master broadcast production environment

Word

3115749 bytes 2023-09-06 [295]�Chapter 3 - Annex 3.4 - Working document towards a preliminary draft revision of Report ITU-R BT.2408 - Guidance for operational practices in HDR television production

Word

37844 bytes 2023-09-06 [295]�Chapter 3 - Annex 3.5 - Draft liaison statement to SMPTE - Nomenclature of controls and metadata in Look-up Table (LUT) conversions

Word

39794 bytes 2023-09-07 [295]�Chapter 3 - Annex 3.6 - Continuation of Rapporteur Group (RG-24) on HDR-TV

Word

49728 bytes 2023-09-20 [295]�Chapter 2 - Annex 2.1 - Preliminary draft revision of Recommendation ITU-R BT.1662 - General reference chain and management of post-processing headroom for programme essence in large screen digital imagery applications

Word

45852 bytes 2023-10-10 [295]�Chapter 2 - Annex 2.2 - Preliminary draft revision of Recommendation ITU-R BT.1666 - User requirements for large screen digital imagery applications intended for presentation in a theatrical environment

Word

46382 bytes 2023-09-05 [295]�Chapter 1 - Annex 1.1 - Working document towards a preliminary draft revision of Question ITU-R 135-2/6 - System parameters for and management of digital sound ystems with and without accompanying picture

Word

6239852 bytes 2023-09-04 [295]�Chapter 1 - Annex 1.2 - Working document towards a preliminary draft new Report ITU-R BS.[AdvSSWorkflow] - Use-cases of production workflows of advanced sound contents

Word

421612 bytes 2023-09-04 [295]�Chapter 1 - Annex 1.3 - Updated work plans for advanced sound system - 2020-2023 and 2024-2027

Word

298034 bytes 2023-09-04 [295]�Chapter 1 - Annex 1.4 - Working documents towards preliminary draft revision of Recommendations ITU-R BS.1283-2 and ITU-R BS.1679-1 - Considering subjective assessment of sound quality in a theatrical environment

Word

35161 bytes 2023-09-05 [295]�Chapter 1 - Annex 1.5 - Liaison statement to Working Party 6B - Updated work plan for advanced sound systems

Word

35008 bytes 2023-09-05 [295]�Chapter 1 - Annex 1.6 - Continuation of a Rapporteur Group on the audio (RG-Audio) with modified name and Terms of Reference

Word

118900 bytes 2023-09-20 [295]� - Report of the meeting of Working Party 6C (Geneva, 28 August - 1 September 2023)

Document :

ITU-R�WP6C� Contribution� 295

Title :

Report of the meeting of Working Party 6C (Geneva, 28 August - 1 September 2023)

Date :

2023-09-01

Source :

Chairman, WP 6C

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-11-22