|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
40443 bytes |
2020-07-31 |
[85]�Annex 18
- List of output (TEMP) documents (Documents 5A/TEMP/1 to 5A/TEMP/51) (51 Temporary Documents) |
|
Word
�
|
1071730 bytes |
2020-08-04 |
[85]�Annex 17
- Working document towards a preliminary draft revision of Report ITU-R M.2417-0 - Technical and operational characteristics of land-mobile service applications
in the frequency range 275-450 GHz
|
|
Word
�
|
114000 bytes |
2020-08-04 |
[85]�Annex 16
- Working document towards a preliminary draft new Report ITU-R M.[CAV] - Connected Automated Vehicles (CAV) |
|
Word
�
|
7752006 bytes |
2020-08-04 |
[85]�Annex 15
- Working document towards a preliminary draft new Report ITU-R M.[100-GHz.RSTT.EESS.COEXIST] - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz,94.1-100 GHz and 102-109.5 GHz, and radio astronomy service and Earth exploration- satellite service (EESS) (active) and EESS (passive) services |
|
Word
�
|
2647722 bytes |
2020-08-04 |
[85]�Annex 14
- Working document towards a preliminary draft new Report ITU-R M.[UCS] [or ITU-R Handbook] - Utility Communication Systems
|
|
Excel 2007
�
|
164324 bytes |
2020-08-04 |
[85]�Annex 13 Part 1
|
|
Word
�
|
317082 bytes |
2020-08-04 |
[85]�Annex 13
- Working document towards a preliminary draft revision of Report ITU-R M.2442-0 - Current and future usage of railway radiocommunication systems between train and trackside |
|
Word
�
|
39452 bytes |
2020-08-04 |
[85]�Annex 12
- Working document towards a preliminary draft new study Question ITU-R [RSTT] - Studies related to the further development of RSTT |
|
Word
�
|
81957 bytes |
2020-08-04 |
[85]�Annex 11
- Working document towards a preliminary draft new Recommendation ITU-R M.[RSTT_FRQ] - Spectrum harmonization for Railway Radiocommunication Systems between Train and Trackside (RSTT) |
|
Word
�
|
394891 bytes |
2020-08-04 |
[85]�Annex 10
- Elements of a working document towards a preliminary draft new Report ITU-R M.[AMATEUR.CHARACTERISTICS] |
|
Word
�
|
39374 bytes |
2020-08-04 |
[85]�Annex 09
- Workplan/Report for WRC-23 agenda item 9.1, topic c) |
|
Word
�
|
37489 bytes |
2020-08-04 |
[85]�Annex 08
- Working document towards preliminary draft CPM text for WRC-23 agenda item 9.1, topic c) - Chapter 5 - General issues (Agenda items 2, 4 and 9.1, topics a), b), c) and d)) |
|
Word
�
|
40611 bytes |
2020-08-04 |
[85]�Annex 07
- Draft Workplan/Report for WRC-23 agenda item 9.1, topic b) |
|
Word
�
|
42894 bytes |
2020-08-04 |
[85]�Annex 06
- Working document towards preliminary draft CPM text for WRC-23 agenda item 9.1, topic b) - Chapter 5 - General issues (Agenda items 2, 4 and 9.1, topics a), b), c) and d)) |
|
Word
�
|
39628 bytes |
2020-08-04 |
[85]�Annex 05
- Workplan/Report for WRC-23 agenda item 1.3 |
|
Word
�
|
38504 bytes |
2020-08-04 |
[85]�Annex 04
- Working document towards preliminary draft CPM text for WRC-23 agenda item 1.3 - Chapter 1 - Fixed, Mobile and Broadcasting issues
(Agenda items 1.1, 1.2, 1.3, 1.4 and 1.5)
|
|
Word
�
|
105268 bytes |
2020-08-11 |
[85]�Annex 03
- Consolidation of reports from the Working Groups of Working Party 5A |
|
Word
�
|
483557 bytes |
2020-08-13 |
[85]�Annex 02
- Consolidation of texts approved by Working Party 5A |
|
Word
�
|
160927 bytes |
2020-07-31 |
[85]�Annex 01
- Working Party 5A Management |
|
Word
�
|
82685 bytes |
2020-08-10 |
[85]�
- Report on the twenty-third meeting of Working Party 5A (Geneva e-Meeting, 20-30 July 2020) |
|
|