|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
30843 bytes |
2021-07-21 |
[79]�Annex 10
- Final List of Participants |
|
Word
�
|
31016 bytes |
2021-07-21 |
[79]�Annex 9
- List of documents issued |
|
Word
�
|
20646566 bytes |
2021-07-21 |
[79]�Annex 8
- Working document towards a preliminary draft revision of Report ITU-R BO.2397-0 - Satellite transmission for UHDTV satellite broadcasting |
|
Word
�
|
32184 bytes |
2021-07-21 |
[79]�Annex 7
- Liaison statement to 3GPP TSG RAN on Satellite IoT - Copy for information to ITU-T Study Group 20 |
|
Word
�
|
34353 bytes |
2021-07-21 |
[79]�Annex 6
- Terms of Reference for Working Party 4B Correspondence Group on satellite radio interface technologies for the satellite component of IMT-2020 |
|
Word
�
|
36255 bytes |
2021-07-21 |
[79]�Annex 5
- Work plan for development of a preliminary draft new Report ITU-R M.[XYZ.ABC] |
|
Word
�
|
40125 bytes |
2021-07-21 |
[79]�Annex 4
- Working document towards a preliminary draft new Report ITU-R M.[XYZ.ABC] on Vision and requirements for satellite radio interface(s) of IMT-2020 |
|
Word
�
|
607924 bytes |
2021-07-21 |
[79]�Annex 3
- Preliminary draft revision of Recommendation ITU-R S.2131-0 - Method for the determination of performance objectives for satellite hypothetical reference digital paths using adaptive coding and modulation |
|
Word
�
|
44753 bytes |
2021-07-21 |
[79]�Annex 2
- Reply liaison statement to ITU-D Study Group 2 Questions 2/2 and 5/2 - ITU-D Study Group 2 Question 2/2: Telecommunications/ICTs for e-Health, and Question 5/2 Utilizing telecommunications/ICTs for disaster risk reduction and management |
|
Word
�
|
33456 bytes |
2021-07-21 |
[79]�Annex 1
- Work plan for the forty-ninth meeting of Working Party 4B (Virtual meeting 12-16 July 2021) |
|
Word
�
|
52677 bytes |
2021-08-06 |
[79]�
- Report on the forty-ninth meeting of Working Party 4B (Virtual Meeting, 12 - 16 July 2021) |
|
|