International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B.AR : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B.AR� C�

ITU-R�WP1B.AR

Spectrum Management Methodologies and Economic Strategies

Results:14 total items.
Contributions �[�Source:�Korea (Republic of)�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 56 ]
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports � Korea (Republic of) 2024-10-22
[ 55 ]
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents � Korea (Republic of) 2024-10-22
[ 54 ]
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) 2024-10-22
[ 53 ]
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2024-10-22
[ 39 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) 2023-05-19
[ 38 ]
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2023-05-19
[ 25 ]
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2022-06-20
[ 24 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2022-06-20
[ 18 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-10-26
[ 17 ]
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization � Korea (Republic of) 2021-10-26
[ 12 ]
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-05-14
[ 6 ]
Proposed revision of Report ITU-R SM.2153-7 [UPDATING SRD RELATED LEGISTLATION IN KOREA] - Technical and operating parameters and spectrum use for short range radiocommunication devices � Korea (Republic of) 2020-11-13
[ 5 ]
Proposesed revision of Report ITU-R SM.2153-7 (Technical Regulation for SRDs in Korea) � Korea (Republic of) 2020-11-13
[ 4 ]
Proposed draft new ITU-R Question - Spectrum management framework for the introduction of GPR/WPR � Korea (Republic of) 2020-11-13
Results:14 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-2-3