International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B.AR : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B.AR� C�

ITU-R�WP1B.AR

Spectrum Management Methodologies and Economic Strategies

Results:5 total items.
Contributions �[�AI/Question:�Q241/1�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 45 ]
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Rep. of) Q241/1 2024-05-29
[ 24 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2022-06-20
[ 19 ]
Factors need to be considered when developing the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] � China (People's Republic of) Q241/1 2021-10-27
[ 18 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-10-26
[ 12 ]
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-05-14
Results:5 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23