|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
1504954 bytes |
2022-07-12 |
[80]�Annex 4
- Working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability] |
|
Word
�
|
928244 bytes |
2022-07-12 |
[80]�Annex 3
- Preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of spectrum efficiency and economic value |
|
Word
�
|
34853 bytes |
2022-07-12 |
[80]�Annex 2
- Work plan for a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
�
|
37096 bytes |
2022-07-12 |
[80]�Annex 1
- Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
�
|
50540 bytes |
2022-07-25 |
[80]�
- Report on the fourth 2020-2023 meeeting of Working Party 1B (Geneva, 28 June to 7 July 2022) |
|
|