International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum Management

Results:17 total items.
Contributions �[�Source:�WP 1B�]���Documents / Contributions

Number
Title Source Date
[ 154 ]
Executive Report on Working Party 1B meeting (Meeting in Thessaloniki from 29 May to 2 June 2023) � Chairman, WP 1B 2023-06-02
[ 144 ]
Preliminary draft revision of ITU-R Resolutions � WP 1B 2023-06-02
[ 143 ]
(Rev.1)
Editorial revision of six Recommendations assigned to ITU-R Working Party 1B � WP 1B 2023-06-02
[ 140 ]
(Rev.1)
New Report ITU-R SM.2523-0 - Assessment of Spectrum efficiency and economic value � WP 1B 2023-06-02
[ 139 ]
(Rev.1)
Editorial revision to Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology � WP 1B 2023-06-02
[ 138 ]
(Rev.1)
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices � WP 1B 2023-06-02
[ 103 ]
Executive Report on Working Party 1B meeting (Meeting in Geneva from 28 June to 7 July 2022) � Chairman, WP 1B 2022-07-07
[ 101 ]
(Rev.1)
Revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization � WP 1B 2022-07-05
[ 100 ]
(Rev.1)
Revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range radiocommunication devices � WP 1B 2022-07-05
[ 99 ]
Draft editorial revision of Recommendation ITU-R SM.1603-2 - Spectrum redeployment as a method of national spectrum management � WP 1B 2022-07-05
[ 76 ]
Executive Report on Working Party 1B meeting (Online meeting, 3-10 November 2021) � Chairman, WP 1B 2021-11-25
[ 58 ]
Executive Report on Working Party 1B meeting (Online meeting, 25 May - 2 June 2021) � Acting Chairman, WP 1B 2021-06-02
[ 51 ]
(Rev.1)
Revision to Report ITU-R SM.2093-3 � WP 1B 2021-05-31
[ 50 ]
(Rev.1)
Revision of Report ITU-R SM.2153-7 - Technical and operating parameters and spectrum use for short range radiocommunication devices � WP 1B 2021-05-31
[ 49 ]
(Rev.1)
Draft new Question ITU-R [GPR/WPR]/1 - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems � WP 1B 2021-05-31
[ 37 ]
(Rev.1)
Executive Report on Working Party 1B (Online meeting, 24 November - 1 December 2020) � Acting Chairman, WP 1B 2020-12-02
[ 32 ]
(Rev.1)
Draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 1B 2020-11-30
Results:17 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-8