International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7B� C�

ITU-R�WP7B

Space Radiocommunication Applications

Results:12 total items.
Contributions �[�Source:�WP 5A�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 387 ]
Liaison statement to Working Party 7B - Revision of Recommendation ITU-R M.1808 � WP 5A 2019-05-14
[ 386 ]
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems � WP 5A 2019-05-13
[ 375 ]
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems � WP 5A 2018-11-20
[ 337 ]
Reply liaison statement to Working Party 7B - Technical and operational characteristics of mobile service systems relevant to the work under WRC-19 agenda item 1.7 � WP 5A 2018-06-01
[ 336 ]
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 1B, 4B and 7B) on contribution concerning Bird-to-Bird packet communication � WP 5A 2018-06-01
[ 331 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 5C, 7B and 7C) - Technical and operational characteristics of conventional and trunked land mobile systems operating in the mobile service allocations below 869 MHz to be used in sharing studies � WP 5A 2018-05-25
[ 249 ]
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions � WP 5A 2017-11-21
[ 179 ]
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3 (copied for information to Working Parties 5B and 5D) � WP 5A AI1.3 2017-06-05
[ 123 ]
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13 � WP 5A AI1.13 2016-12-01
[ 121 ]
Liaison statement to Working Party 7B (copy for information to Working Party 5D) - Technical characteristics for WRC-19 agenda item 1.3 � WP 5A AI1.3 2016-11-23
[ 48 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A 2016-05-25
[ 47 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3 � WP 5A 2016-05-25
Results:12 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9