International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:28 total items.
Contributions �[�AI/Question:�AI1.13�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1293 ]
Update on recent activities within CEPT � ITU Region 1 (CEPT) Rapporteur AI1.13 2019-07-08
[ 544 ]
Liaison statement to Task Group 5/1 for WRC-19 agenda item 1.13 (copy for information to Working Party 5D) � WP 7B AI1.13 2017-04-11
[ 538 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 534 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13 � WPs 3K, 3J and 3M AI1.13 2017-04-03
[ 406 ]
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13 � WP 5A AI1.13 2016-11-23
[ 385 ]
Reply liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13 (copy for information to Working Parties 5C and 5D) � WP 7B AI1.13 2016-11-01
[ 333 ]
Answers to Question on Spectrum Needs for IMT under WRC-19 agenda item 1.13 � Korea (Republic of) AI1.13 2016-09-28
[ 326 ]
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13 � Japan AI1.13 2016-09-28
[ 309 ]
Proposed input contributions on spectrum needs for IMT under WRC-19 agenda item 1.13 � Thailand AI1.13 2016-09-28
[ 307 ]
Consideration on IMT-2020 network parameters for sharing and compatibility studies for WRC-19 agenda item 1.13 � China (People's Republic of) AI1.13 2016-09-28
[ 305 ]
Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz for WRC-19 agenda item 1.13 � China (People's Republic of) AI1.13 2016-09-28
[ 287 ]
Response to "Questions on spectrum needs for IMT under WRC-19 agenda item 1.13" � Sweden AI1.13 2016-09-27
[ 257 ]
Technical parameters related to IMT-2020 for the compatibility and sharing studies under agenda item 1.13 � France AI1.13 2016-09-22
[ 173 ]
Consideration on IMT networks parameters for sharing and compatibility studies under WRC-19 agenda item 1.13 � China (People's Republic of) AI1.13 2016-06-07
[ 172 ]
Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz for WRC-19 agenda item 1.13 � China (People's Republic of) AI1.13 2016-06-07
[ 159 ]
WRC-19 agenda item 1.13: Survey-based approach to determine the spectrum needs for IMT � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-06-06
[ 158 ]
WRC-19 agenda item 1.13: Application-based approach to determine the spectrum needs for IMT � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-06-06
[ 132 ]
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D � Chairmen, SG 3, WP 3J, WP 3K and WP 3M AI1.13 2016-06-01
[ 118 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13 � TG 5/1 AI1.13 2016-05-25
[ 104 ]
WRC-19 agenda item 1.13: Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-05-03
[ 69 ]
Consideration on parameters for IMT networks to be used in sharing studies including WRC-19 agenda item 1.13 � Japan AI1.13 2016-02-16
[ 59 ]
Proposals for Report ITU-R M.[IMT-2020.SHARE.PARA] - Regarding WRC-19 agenda item 1.13 � Korea (Republic of) AI1.13 2016-02-16
[ 58 ]
Proposed working method of spectrum-related studies in Working Party 5D for WRC-19 agenda item 1.13 � Korea (Republic of) AI1.13 2016-02-16
[ 45 ]
Discussion of parameters for use in studies under WRC-19 agenda item 1.13 � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-02-15
[ 39 ]
WRC-19 agenda item 1.13: Work plan and proposed liaison to Task Group 5/1 on spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-02-15
[ 31 ]
WRC-19 agenda item 1.13: Spectrum needs for th terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-02-12
[ 29 ]
WRC-19 agenda item 1.13: Work plan and proposed liaison to Task Group 5/1 on technical and operational characteristics within the frequency range between 24.25 and 86 GHz for the future development of International Mobile Telecommunications for 2020 and beyond � United Kingdom of Great Britain and Northern Ireland AI1.13 2016-02-12
[ 15 ]
Consideration on IMT spectrum needs estimate for WRC-19 - agenda item 1.13 � China (People's Republic of) AI1.13 2016-02-05
Results:28 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23