International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:39 total items.
Contributions �[�Source:�WP 1A�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 660 ]
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems � WP 1A 2019-06-21
[ 659 ]
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications � WP 1A 2019-06-21
[ 658 ]
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D - Information related to WRC-19 agenda item 1.15 � WP 1A 2019-06-21
[ 657 ]
Reply liaison statement to Working Party 5C - Development of a Recommendation on principles and approaches of limiting unwanted emissions for improving HF electromagnetic environment � WP 1A 2019-06-21
[ 656 ]
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range � WP 1A 2019-06-18
[ 655 ]
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise � WP 1A 2019-06-18
[ 654 ]
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference � WP 1A 2019-06-18
[ 652 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2019-06-14
[ 543 ]
Reply liaison statement to Working Party 5C (copy for information to Working Party 5A) - WRC-19 agenda item 1.15 � WP 1A AI1.15 2018-06-29
[ 542 ]
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems � WP 1A 2018-06-29
[ 541 ]
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification � WP 1A 2018-06-29
[ 539 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Radio Regulations � WP 1A 2018-06-21
[ 538 ]
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems � WP 1A 2018-06-21
[ 425 ]
Liaison statement to Working Parties 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2017-12-12
[ 424 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2017-12-12
[ 423 ]
Liaison statement to Working Parties 1C, 3L and 5B (copy to Working Parties 5A and 5C) - HF radio noise measurements at sea � WP 1A 2017-12-12
[ 422 ]
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans � WP 1A 2017-12-12
[ 309 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2017-07-10
[ 308 ]
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15 � WP 1A 2017-07-10
[ 307 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12) � WP 1A 2017-07-10
[ 301 ]
Liaison statement to Working Party 3K on propagation characteristics in the 275-450 GHz band (copy to Working Parties 3J, 3M, 5A, 5C, 7C and 7D for information) � WP 1A AI1.15 2017-07-05
[ 194 ]
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT) � WP 1A Q210/1 2016-12-13
[ 193 ]
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT) � WP 1A Q210/1 2016-12-13
[ 192 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than Radio Frequency Beam � WP 1A Q210/1 2016-12-13
[ 191 ]
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-12-13
[ 190 ]
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1) � WP 1A Q236/1, Q221/1 2016-12-13
[ 189 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) � WP 1A 2016-12-13
[ 187 ]
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4 � WP 1A 2016-12-13
[ 87 ]
Liaison statement to Working Parties 5A, 5C and 6A - Revision of Recommendation ITU-R SM.851 � WP 1A 2016-06-21
[ 86 ]
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services � WP 1A 210-3/1 2016-06-16
[ 85 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B � WP 1A 210-3/1 2016-06-16
[ 84 ]
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 1A 210-3/1 2016-06-16
[ 83 ]
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 1A 210-3/1 2016-06-16
[ 82 ]
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services � WP 1A 2016-06-15
[ 81 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 1A 2016-06-13
[ 80 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 79 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans � WP 1A 2016-06-13
[ 78 ]
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 73 ]
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-08
Results:39 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9