International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5B� C�

ITU-R�WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:11 total items.
Contributions �[�Source:�WP 1B�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 719 ]
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer � WP 1B 2019-06-17
[ 650 ]
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1) � WP 1B AI9.1 2018-11-29
[ 649 ]
Reply liaison statement to Working Party 5B - Aeronautical radionavigation service information for Wireless Power Transmission (WPT) � WP 1B 2018-11-29
[ 549 ]
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6 � WP 1B AI9.1 2018-06-28
[ 214 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands... � WP 1B 2016-12-14
[ 213 ]
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information) � WP 1B 2016-12-14
[ 212 ]
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)" � WP 1B 210/1 2016-12-14
[ 211 ]
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 (Resolution 958 (WRC-15) Annex item 1) "Wireless power transmission" � WP 1B AI9.1 2016-12-14
[ 99 ]
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 - "Wireless power transmission for Electric Vehicles (WPT4EV)" � WP 1B AI9.1 2016-06-20
[ 87 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing... � WP 1B 2016-06-13
[ 86 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information) � WP 1B 2016-06-13
Results:11 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9