International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5A� C�

ITU-R�WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:11 total items.
Contributions �[�Source:�WP 4C�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1086 ]
Liaison statement to Working Parties 5A, 5C, 7B, 7C and 7D - Non-geostationary satellites operating space-to-space links in mobile-satellite service (MSS) allocations in the 1-3 GHz range � WP 4C 2019-07-17
[ 1085 ]
Liaison statement to Working Party 5D (Copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band � WP 4C 2019-07-02
[ 865 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4C 2018-07-02
[ 679 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems � WP 4C 2018-02-20
[ 678 ]
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4C 2018-02-19
[ 677 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions � WP 4C 2018-02-19
[ 676 ]
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems � Chairman, WP 4C 2018-02-16
[ 512 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4C 2017-10-16
[ 511 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters � WP 4C 2017-10-16
[ 368 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (Copy to Working Parties 4A, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 4C 2017-05-04
[ 173 ]
Reply liaison statement to Working Party 1B on infrastructure sharing (copy to Working Parties 4A, 5A, 5C and 5D) - "Innovative" regulatory tools to support enhanced shared use of the spectrum � WP 4C 208-1/1 2016-09-27
Results:11 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9