International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5A� C�

ITU-R�WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:16 total items.
Contributions �[�Source:�WP 1B�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1075 ]
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer � WP 1B 2019-06-17
[ 977 ]
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1) � WP 1B AI9.1 2018-11-29
[ 859 ]
Liaison statement to ETSI ERM TG 17 (copy to ITU-R Working Party 5A) - Operation of short-range radiocommunication public access system supporting hearing aid systems � WP 1B 2018-06-28
[ 858 ]
Liaison statement to ITU-D Study Group 2 and ITU-R Working Party 5A - 'Bird-to-Bird' packet communication � WP 1B 2018-06-28
[ 663 ]
Reply liaison statement to Working Party 5A (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 1B AI9.1 2017-12-08
[ 489 ]
Liaison statement to Working Parties 4A, 4C, 5A and 5D - New Report ITU-R SM.2404-0 (ex. [REGULATORY TOOLS]) - Regulatory tools to support enhanced shared use of the spectrum � WP 1B Q208/1 2017-07-10
[ 488 ]
Liaison statement to APT and ITU-R Working Parties 5A and 5D - New Report ITU-R SM.2405-0 (ex.[CRS SPECTRUM MANAGEMENT CHALLENGES]) - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 1B 2017-07-10
[ 487 ]
Liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 20 - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 1B AI9.1 2017-07-10
[ 318 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands... � WP 1B 2016-12-14
[ 317 ]
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A) � WP 1B 2016-12-14
[ 316 ]
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information) � WP 1B 2016-12-14
[ 143 ]
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Working Parties 1A and 5A for information) - Working document towards a preliminary draft new Recommendation ITU-R SM.[G.WNB-FREQ] � WP 1B 2016-06-23
[ 142 ]
Reply liaison statement to Working Party 5A on the study of sharing schemes in the land mobile service on the basis of geographical USE, frequencies, services, new technologies and applications � WP 1B 2016-06-22
[ 129 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing... � WP 1B 2016-06-13
[ 128 ]
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum � WP 1B 208-1/1 2016-06-13
[ 127 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information) � WP 1B 2016-06-13
Results:16 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9