International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:25 total items.
Contributions �[�Source:�WP 5A�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 840 ]
Liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Recommendation ITU-R M.[MS-RXCHAR-28] � WP 5A 2019-05-15
[ 703 ]
Reply liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space to Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5 � WP 5A AI1.5 2018-06-01
[ 697 ]
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14 � WP 5A AI1.14 2018-05-25
[ 536 ]
Liaison statement to Working Party 4A - Updated receiver characteristics of systems in the land mobile service for use in sharing and compatibility studies for WRC-19 agenda item 1.5 � WP 5A AI1.5 2017-11-22
[ 533 ]
Liaison statement to Working Party 4A - Sharing and compatibility studies regarding WRC-19 agenda item 1.16 � WP 5A AI1.16 2017-11-21
[ 532 ]
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions � WP 5A 2017-11-21
[ 374 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 5A 2017-06-05
[ 373 ]
Liaison statement to Working Party 4A (copy for information to Working Party 5C) - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz � WP 5A 2017-06-05
[ 372 ]
Liaison statement to Working Party 4A - Inconsistency between field RR Appendix 4 C/N objectives and other technical parameters � WP 5A 2017-06-05
[ 371 ]
Liaison statement to Working Party 4A (copy for information to Working Party 4C) - Sharing and compatibility studies regarding WRC-19 agenda item 1.16 � WP 5A AI1.16 2017-06-05
[ 370 ]
Liaison statement to Working Party 4A - WRC-19 agenda item 9.1, issue 9.1.3 � WP 5A AI9.1 2017-06-05
[ 369 ]
Liaison statement to Woking Party 4A - Modifications to RR Appendix 4 data elements to be provided or non-geostationary satellite networks/systems � WP 5A 2017-06-05
[ 226 ]
Liaison statement to Working Party 4A - Mobile service technical and operational characteristics and protection criteria for use in sharing studies under WRC-19 agenda item 1.5 � WP 5A AI1.5 2016-11-29
[ 225 ]
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13 � WP 5A AI1.13 2016-11-23
[ 224 ]
Liaison statement to Working Party 4A - WRC-19 agenda item 9.1, issue 9.1.3 � WP 5A AI9.1 2016-11-23
[ 223 ]
Reply liaison statement to Working Party 4A - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.16 � WP 5A AI1.16 2016-11-23
[ 222 ]
Liaison statement to Working Party 4A (copy to Working Parties 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] � WP 5A 2016-11-23
[ 221 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz � WP 5A 2016-11-23
[ 214 ]
Liaison statement to Working Parties 1A and 1B (copy for information to Working Parties 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use � WP 5A 2016-11-18
[ 76 ]
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5A AI1.16 2016-05-25
[ 75 ]
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16) � WP 5A 2016-05-25
[ 74 ]
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication � WP 5A 2016-05-25
[ 73 ]
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] � WP 5A 2016-05-25
[ 72 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A AI1.7 2016-05-25
[ 71 ]
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications � WP 5A 2016-05-25
Results:25 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-24