International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:30 total items.
Contributions �[�Source:�Japan�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 848 ]
Proposed modifications to preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3 � Japan 2019-06-11
[ 847 ]
Measured antenna patterns of receiving earth station for the BSS in the band 21.4-22.0 GHz � Japan Q280/4 2019-06-11
[ 846 ]
Considerations on 4.1.20 of AP30/30A to Radio Regulations � Japan 2019-06-11
[ 845 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz � Japan , Korea (Republic of) AI1.5 2019-06-11
[ 714 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-06-18
[ 713 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-06-18
[ 712 ]
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 � Japan AI9.1 2018-06-18
[ 711 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � Japan AI9.1 2018-06-18
[ 710 ]
Considerations on the PFD and EPM criteria relating to WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments � Japan AI7 2018-06-18
[ 552 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-02-06
[ 551 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-02-06
[ 550 ]
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 � Japan AI9.1 2018-02-06
[ 549 ]
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � Japan AI9.1 2018-02-06
[ 548 ]
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit � Japan AI7 2018-02-06
[ 547 ]
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments � Japan AI7 2018-02-06
[ 546 ]
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands � Japan AI7 2018-02-06
[ 403 ]
Proposed revision to working document - Validation of the minimum and maximum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendices 30, 30A and 30B � Japan 2017-10-03
[ 402 ]
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issues 9.1.2) � Japan AI9.1 2017-10-03
[ 401 ]
Proposal on the mitigation measures for sharing and compatibility studies between Earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS and MS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5 � Japan AI1.5 2017-10-03
[ 400 ]
Proposal on the calculation method of separation distance between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5 � Japan AI1.5 2017-10-03
[ 399 ]
Consideration on the reference EPM - In relation to issue G under agenda item 7 � Japan AI7 2017-10-03
[ 398 ]
Proposal for inclusion of an issue under WRC-19 agenda item 7 - Modification of Section 1, Annex 1 of RR Appendix 30 � Japan AI7 2017-10-03
[ 397 ]
Proposal for the modification to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands � Japan AI7 2017-10-03
[ 247 ]
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2) � Japan AI9.1 2017-03-28
[ 246 ]
Proposal relating to issue of modification of Section 1, Annex 1 of AP30 under agenda item 7 � Japan AI7 2017-03-28
[ 245 ]
Views relating to the treatment of issue G - Under agenda item 7 � Japan AI7 2017-03-28
[ 244 ]
Treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth � Japan 2017-03-28
[ 104 ]
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (Issue 9.1.2) � Japan AI9.1 2016-09-08
[ 10 ]
Draft revision of Report ITU-R BO.2019 - Interference calculation methods � Japan 2016-03-24
[ 9 ]
Draft Note to the Director, Radiocommunication Bureau - Proposed modifications to Section B3, Part B of the Rules of Procedure in the application of RR No. 11.32A - Rules concerning calculation methodology for calculating the probability of harmful interference between space networks � Japan 2016-03-24
Results:30 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9