Contributions
�[�Source:�Japan�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 848 ]
�
� |
Proposed modifications to preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3
�
� |
Japan
� |
� |
2019-06-11 |
|
[ 847 ]
�
� |
Measured antenna patterns of receiving earth station for the BSS in the band 21.4-22.0 GHz
�
� |
Japan
� |
Q280/4
� |
2019-06-11 |
|
[ 846 ]
�
� |
Considerations on 4.1.20 of AP30/30A to Radio Regulations
�
� |
Japan
� |
� |
2019-06-11 |
|
[ 845 ]
�
� |
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
�
� |
Japan
,
Korea (Republic of)
� |
AI1.5
� |
2019-06-11 |
|
[ 714 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-06-18 |
|
[ 713 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-06-18 |
|
[ 712 ]
�
� |
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
�
� |
Japan
� |
AI9.1
� |
2018-06-18 |
|
[ 711 ]
�
� |
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
Japan
� |
AI9.1
� |
2018-06-18 |
|
[ 710 ]
�
� |
Considerations on the PFD and EPM criteria relating to WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
�
� |
Japan
� |
AI7
� |
2018-06-18 |
|
[ 552 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-02-06 |
|
[ 551 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-02-06 |
|
[ 550 ]
�
� |
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
�
� |
Japan
� |
AI9.1
� |
2018-02-06 |
|
[ 549 ]
�
� |
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
Japan
� |
AI9.1
� |
2018-02-06 |
|
[ 548 ]
�
� |
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 547 ]
�
� |
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 546 ]
�
� |
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 403 ]
�
� |
Proposed revision to working document - Validation of the minimum and maximum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendices 30, 30A and 30B
�
� |
Japan
� |
� |
2017-10-03 |
|
[ 402 ]
�
� |
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issues 9.1.2)
�
� |
Japan
� |
AI9.1
� |
2017-10-03 |
|
[ 401 ]
�
� |
Proposal on the mitigation measures for sharing and compatibility studies between Earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS and MS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5
�
� |
Japan
� |
AI1.5
� |
2017-10-03 |
|
[ 400 ]
�
� |
Proposal on the calculation method of separation distance between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5
�
� |
Japan
� |
AI1.5
� |
2017-10-03 |
|
[ 399 ]
�
� |
Consideration on the reference EPM - In relation to issue G under agenda item 7
�
� |
Japan
� |
AI7
� |
2017-10-03 |
|
[ 398 ]
�
� |
Proposal for inclusion of an issue under WRC-19 agenda item 7 - Modification of Section 1, Annex 1 of RR Appendix 30
�
� |
Japan
� |
AI7
� |
2017-10-03 |
|
[ 397 ]
�
� |
Proposal for the modification to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
�
� |
Japan
� |
AI7
� |
2017-10-03 |
|
[ 247 ]
�
� |
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)
�
� |
Japan
� |
AI9.1
� |
2017-03-28 |
|
[ 246 ]
�
� |
Proposal relating to issue of modification of Section 1, Annex 1 of AP30 under agenda item 7
�
� |
Japan
� |
AI7
� |
2017-03-28 |
|
[ 245 ]
�
� |
Views relating to the treatment of issue G - Under agenda item 7
�
� |
Japan
� |
AI7
� |
2017-03-28 |
|
[ 244 ]
�
� |
Treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth
�
� |
Japan
� |
� |
2017-03-28 |
|
[ 104 ]
�
� |
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (Issue 9.1.2)
�
� |
Japan
� |
AI9.1
� |
2016-09-08 |
|
[ 10 ]
�
� |
Draft revision of Report ITU-R BO.2019 - Interference calculation methods
�
� |
Japan
� |
� |
2016-03-24 |
|
[ 9 ]
�
� |
Draft Note to the Director, Radiocommunication Bureau - Proposed modifications to Section B3, Part B of the Rules of Procedure in the application of RR No. 11.32A - Rules concerning calculation methodology for calculating the probability of harmful interference between space networks
�
� |
Japan
� |
� |
2016-03-24 |
Results:30 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):