International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:43 total items.
Contributions �[�Source:�Canada�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 876 ]
Working document towards a preliminary draft new Report - Tolerances for the orbital characteristics of non-GSO space stations in the FSS [and BSS] � Canada 2019-06-19
[ 753 ]
Sharing study relating (I/N) to spectral efficiency of satellite networks using adaptive coding and modulation (ACM) � Canada AI1.6 2018-06-25
[ 752 ]
Update to EESS compatibility study in the 50 GHz range under agenda item 1.6 � Canada AI1.6 2018-06-25
[ 751 ]
Revision to sharing study between GSO and non-GSO FSS systems in the 50/40 GHz bands - WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 750 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue I � Canada AI7 2018-06-25
[ 749 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A � Canada AI7 2018-06-25
[ 748 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue H � Canada AI17 2018-06-25
[ 747 ]
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 746 ]
Establishment of Correspondence Group for review of V-band GSO reference links - WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 745 ]
Revisions for the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � Canada AI19.1 2018-06-25
[ 744 ]
Revisions for the draft CPM text for WRC-19 agenda item 1.5 � Canada AI1.5 2018-06-25
[ 645 ]
Dependencies between the working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] and the working document towards a preliminary draft new Report ITU-R S.[MOD_NON-GSO] � Canada AI7 2018-02-13
[ 644 ]
Protection criteria and apportionment for FSS receivers for use in sharing studies under WRC-19 agenda item 1.13 � Canada AI1.13 2018-02-13
[ 643 ]
Working document towards a draft new Recommendation - V-band GSO reference links � Canada AI1.6 2018-02-13
[ 642 ]
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz � Canada AI1.5 2018-02-13
[ 641 ]
Update on sharing study between EESS and non-GSO FSS in the frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz under WRC-19 agenda item 1.6 � Canada AI1.6 2018-02-13
[ 640 ]
Study of mitigation techniques between non-GSO FSS systems in the 50/40 GHz bands - Agenda item 1.6 � Canada AI1.6 2018-02-13
[ 639 ]
Study of sharing between GSO and non-GSO FSS systems in the 50/40 GHz bands - Agenda item 1.6 � Canada AI1.6 2018-02-13
[ 638 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A � Canada AI7 2018-02-13
[ 637 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services � Canada AI7 2018-02-13
[ 636 ]
Proposed modifications to the working document towards draft CPM text for WRC-19 agenda item 7 - Issue I � Canada AI7 2018-02-13
[ 635 ]
Proposed modification to the working document towards draft CPM text for WRC-19 agenda item 7 - Issue H � Canada AI7 2018-02-13
[ 634 ]
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6 � Canada AI1.6 2018-02-13
[ 440 ]
Validation of the minimum emission parameters contained within submissions of FSS satellite networks not subject to a plan � Canada , United Kingdom of Great Britain and Northern Ireland 2017-10-09
[ 419 ]
Preliminary draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary -satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations (Draft) � Canada 2017-10-06
[ 418 ]
Observations on procedural issues related to the application of a possible revision to Recommendation ITU-R S.1503-2 � Canada AI7 2017-10-06
[ 417 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S. [NGSO_FSS_BIU] � Canada AI7 2017-10-06
[ 416 ]
Comments and proposals relating to Issue C3 under agenda item 7 � Canada AI7 2017-10-06
[ 415 ]
Proposed modifications to the preliminary draft CPM Report on agenda item 7 Issue D � Canada AI7 2017-10-06
[ 414 ]
Proposed preliminary CPM Report for Issue H under agenda item 7 � Canada AI7 2017-10-06
[ 413 ]
Study of mitigation techniques between non-GSO FSS systems in the bands 36-37 GHz and 50.2-50.4 GHz � Canada AI1.6 2017-10-06
[ 412 ]
Study between non-Geostationary FSS systems and EESS (passive) systems in the bands 50.2-50.4 GHz � Canada AI1.6 2017-10-06
[ 411 ]
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9 � Canada AI9.1 2017-10-06
[ 313 ]
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A � Canada AI7 2017-04-26
[ 312 ]
WRC-19 agenda item 1.6 - Considerations on non-GSO/GSO FSS sharing in the Q/V band � Canada AI1.6 2017-04-26
[ 311 ]
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9 � Canada AI9.1 2017-04-26
[ 310 ]
Bringing into use of frequency assignments to non-geostationary satellite networks or systems � Canada AI7 2017-04-26
[ 309 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21 � Canada AI7 2017-04-26
[ 308 ]
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems � Canada AI7 2017-04-26
[ 307 ]
Study between non-geostationary FSS systems and EESS (passive) systems in the bands 36-37 GHz and 50.2-50.4 GHz � Canada AI1.6 2017-04-26
[ 147 ]
Proposals relating to the treatment of Issue A under agenda item 7 � Canada AI7 2016-09-20
[ 146 ]
Identification of those specific satellite networks and systems with which coordination needs to be effected under RR nos. 9.12, 9.12A and 9.13 or 9.21 � Canada 2016-09-20
[ 49 ]
Difficulties that may be encountered when applying Recommendation ITU-R S.1503-2 and a proposed work plan for its possible revision - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of Radio Regulations � Canada 2016-04-06
Results:43 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23