International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1C� C�

ITU-R�WP1C

Spectrum Monitoring

Results:7 total items.
Contributions �[�Source:�WP 1B�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 187 ]
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1) � WP 1B AI9.1 2018-11-29
[ 116 ]
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7 � WP 1B AI9.1 2017-12-08
[ 64 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands... � WP 1B 2016-12-14
[ 63 ]
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A) � WP 1B 2016-12-14
[ 43 ]
Liaison statement to Working Parties 1C and 4A (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals � WP 1B AI9.1 2016-06-20
[ 41 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing... � WP 1B 2016-06-13
[ 40 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information) � WP 1B 2016-06-13
Results:7 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9