|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
46457 bytes |
2018-06-28 |
[303]�Annex 09
- Reply liaison statement to ITU-D Study Group 1 Question 2/1 on collaboration |
|
Word
�
|
348028 bytes |
2018-06-28 |
[303]�Annex 08
- Working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTIONS] - [Assessment of spectrum efficiency and economic value] |
|
Word
�
|
8638781 bytes |
2018-06-28 |
[303]�Annex 07
- Working documnt towards preliminary draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities |
|
Word
�
|
228671 bytes |
2018-06-28 |
[303]�Annex 06
- Preliminary draft revision of Report ITU-R SM.2015 - Methods for determining national long-term strategies for spectrum utilization |
|
Word
�
|
48014 bytes |
2018-06-28 |
[303]�Annex 05
- Liaison statement to External Organizations and SDOs IEC, ISO, SAE (copy to APT, AFA, ARIB, ATIS, BWF, CCSA, CEA, ETSI, IEEE, ISACC, NFC FORUM, TIA, TTA, TTC, URSI (UCWG on SPS), WPC, WIPE and WIPOT) - Wireless Power Transmission... |
|
Excel 2007
�
|
15765 bytes |
2018-06-28 |
[303]�Annex 04 Part 1
|
|
Word
�
|
18329360 bytes |
2018-06-28 |
[303]�Annex 04
- Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)] |
|
Word
�
|
45244 bytes |
2018-06-28 |
[303]�Annex 03
- Work plan for WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex Item 1 (WPT-EV) |
|
Word
�
|
54752 bytes |
2018-06-28 |
[303]�Annex 02
- Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15), Annex item 1 |
|
Word
�
|
58443 bytes |
2018-06-28 |
[303]�Annex 01
- Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 |
|
Word
�
|
61763 bytes |
2018-07-11 |
[303]�
- Report on the fifth 2015-2019 meeting of Working Party 1B (Geneva, 4-12 June 2018) |
|
|
|
�
Document :
|
ITU-R�WP1B�
Contribution�
303
|
Title :
|
Report on the fifth 2015-2019 meeting of Working Party 1B (Geneva, 4-12 June 2018)
|
Date :
|
2018-06-12
|
Source :
|
Chairman, WP 1B
|
Access :
|
Restricted to TIES users�[ITU-R]
|
|