|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
54504 bytes |
2017-12-11 |
[237]�Annex 13
- Working document towards preliminary draft revision of Recommendation ITU-R SM.1896 - Frequency ranges for global or regional harmonization of short-range devices |
|
Word
�
|
232522 bytes |
2017-12-11 |
[237]�Annex 12
- Working document towards a preliminary draft revision on Report ITU-R SM.2015 - Methods for determining national long-term strategies for spectrum utilization |
|
Word
�
|
113663 bytes |
2017-12-08 |
[237]�Annex 11
- Working document towards a preliminary draft revision of Report ITU-R SM.2012-5 - Economic aspects of spectrum management |
|
Word
�
|
46589 bytes |
2017-12-08 |
[237]�Annex 10
- Terms of Reference of the Correspondence Group on WRC-19 agenda item 9.1, Issue 9.1.8 (Item 3 of the Annex to Resolution 958 (WRC-15)) |
|
Word
�
|
69835 bytes |
2017-12-08 |
[237]�Annex 09
- Working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] - Technical and operational aspects of Low Power Wide Area Networks (LPWAN) for Machine-Type Communication and the Internet of Things in frequency ranges harmonised for SRD operation |
|
Word
�
|
165326 bytes |
2017-12-08 |
[237]�Annex 08
- Working document towards a preliminary draft new Report on studies for WRC-19 agenda item 9.1, Issue 9.1.7 |
|
Word
�
|
48805 bytes |
2017-12-08 |
[237]�Annex 07
- Work Plan for WRC-19 agenda item 9.1, Issue 9.1.7, Res. 958 (WRC-15) Annex item 2 |
|
Word
�
|
196397 bytes |
2017-12-08 |
[237]�Annex 06
- Working document towards draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.7 - Resolution 958 (WRC-15), Annex item 2 |
|
Word
�
|
50042 bytes |
2017-12-08 |
[237]�Annex 05
- Liaison statement to External Organizations and standards development organizations IEC, ISO, SAE - Wireless Power Transmission - Invitation for IEC, ISO, SAE and other SDOs to collaborate with the ITU-R to avoid conflicting outcomes |
|
Word
�
|
46512 bytes |
2017-12-08 |
[237]�Annex 04
- Terms of Reference (ToR) for the Working Party 1B Rapporteur Group (RG-WPT) ON developing content for deliverables related to WRC-19 agenda item 9.1 in response to Resolution 958 (WRC-15) "Urgent studies required in preparation for the 2019 World Radiocommunication Conference" Annex item 1 |
|
Word
�
|
10990214 bytes |
2017-12-08 |
[237]�Annex 03
- Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)] |
|
Word
�
|
45921 bytes |
2017-12-08 |
[237]�Annex 02
- Work plan for WRC-19 agenda item 9.1, Issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV) |
|
Word
�
|
61621 bytes |
2017-12-08 |
[237]�Annex 01
- Working document towards draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV) |
|
Word
�
|
63662 bytes |
2017-12-14 |
[237]�
- Report on the fourth 2015-2019 meeting of Working Party 1B - (Geneva, 23-30 November 2017) |
|
|