International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG5.1.AR : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG5.1.AR� C�

ITU-R�TG5.1.AR

Task Group 5/1

Results:4 total items.
Contributions �[�Source:�Australia�]���Documents / Contributions

Number
Title Source Date
[ 223 ]
Sharing study for IMT systems in the 24.25-27.5 GHz frequency range with FSS � Australia 2018-04-19
[ 129 ]
(Rev.1)
Preliminary sharing study for IMT systems in the 24.25-27.5 GHz frequency range with FSS � Australia 2018-01-05
[ 68 ]
Preliminary sharing study for IMT systems in the 24.25-27.5 GHz frequency range with FSS � Australia 2017-09-11
[ 42 ]
Preliminary proposal for a methodology to conduct IMT- 2020/FSS sharing studies � Australia 2017-05-08
Results:4 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-2-3