International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7B : Contributions : 330 Recently posted�-� Search Meeting Documents
[330]� Report of the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015) (Geneva, 1-7 October 2014)

Format

Size

Posted

English

Word

43327 bytes 2014-10-16 [330]�Annex 08 - Status of SA-Series Recommendations

Word

99842 bytes 2014-10-16 [330]�Annex 07 - Preliminary draft new Report ITU-R SA.[NANO/PICOSAT CURRENT PRACTICE] - Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites

Word

306489 bytes 2014-10-16 [330]�Annex 06 - Proposed modifications to Question ITU-R 254/7

Word

53094 bytes 2014-10-16 [330]�Annex 05 - Proposed preliminary draft new Recommendation ITU-R SA.[SRS/FSS 37GHz] - Frequency sharing between SRS and FSS (space-to-Earth) systems in the 37.5-38 GHz band

Word

39511 bytes 2014-10-08 [330]�Annex 04 - A note to the Chairman of Study Group 7 - Protection of SRS earth stations from aircraft stations in the 2 200-2 290 MHz band

Word

92687 bytes 2014-10-08 [330]�Annex 03 - Preliminary draft new Recommendation ITU-R SA.[SRS-AIRCRAFT 2 GHz] - Protection of SRS earth stations from mobile (aircraft) stations in the 2 200-2 290 MHz band

Word

308300 bytes 2020-12-17 [330]�Annex 02 - Working document toward a preliminary draft new Report - Characteristics to be used for assessing interference to systems operating in the earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word

508069 bytes 2014-10-09 [330]�Annex 01 - Preliminary draft new Report ITU-R SA.[GSO EESS-SPACE-7GHZ] - Compatibility between GSO EESS (Earth-to-space), the fixed service, the mobile service, the space research service, or the space operation service in the band 7 190-7 235 MHz

Word

64545 bytes 2014-10-24 [330]� - Report on the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015)

Document :

ITU-R�WP7B� Contribution� 330

Title :

Report of the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015) (Geneva, 1-7 October 2014)

Date :

2014-10-07

Source :

Chairman, WP 7B

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-17