International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7B : Contributions : 88 Recently posted�-� Search Meeting Documents
[88]� Report on the September 2012 meeting of Working Party 7B with a view to its next meeting (April 2013) (Manta, Ecuador, 24-28 September 2012)

Format

Size

Posted

English

Word

3884725 bytes 2012-10-22 [88]�Annex 21 - Working document towards ITU-R Report [or draft element of the CPM texz] - Preliminary results for feasibility of FSS/SRS sharing in the frequency bands 7 150-7 250 MHz and 8 400-8 500 MHz

Word

1647362 bytes 2012-10-22 [88]�Annex 20 - Working document towards a preliminary draft new Report - Compatibility between the Earth exploration-satellite service (Active) and the space research service in the frequency band 8 400-8 500 MHz

Word

56373 bytes 2012-10-22 [88]�Annex 19 - Working document towards a reply liaison statement to Working Party 4A - SRS usage of the 8 400-8 500 MHz band

Word

1408511 bytes 2012-10-19 [88]�Annex 18 - Proposed revision of draft new Report ITU-R SA.[SRS SHARING 37 GHz] - Protection of SRS and FSS systems sharing the 37.5-38 GHz band

Word

61381 bytes 2012-10-19 [88]�Annex 17 - Draft CPM text on WRC-12 Agenda item 9.1.8, Resolution 757 (WRC-12) - Chapter 5, Satellite regulatory issues (Agenda items 7, 9.1.1, 9.1.2, 9.1.3, 9.1.5, 9.1.8, 9.3)

Word

69787 bytes 2012-10-19 [88]�Annex 16 - Working document towards a preliminary draft new Report ITU-R SA.[NANO/PICOSAT CHARACTERISTICS] - [Characteristics, definitions and spectrum requirements of nano- and picosatellites, as well as systems composed of such satellites]

Word

123201 bytes 2012-10-19 [88]�Annex 15 - Preliminary draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems

Word

65717 bytes 2012-10-19 [88]�Annex 14 - Working document on the work plan and milestones for Agenda item 1.13 - Draft work plan for studies required for WRC-15 Agenda iterm 1.13

Word

67549 bytes 2012-10-19 [88]�Annex 13 - Preliminary draft new Report ITU-R SA.[SPECTRUM REQUIREMENTS] - Spectrum requirements for future EESS missions operating under a potential new EESS uplink allocation in the 7/8 GHz range

Word

77779 bytes 2012-10-19 [88]�Annex 12 - Preliminary draft new Recommendation ITU-R SA.[EES/MET METH] - Protection criteria for meteorological satellite and Earth exploration satellite system

Word

61229 bytes 2012-10-19 [88]�Annex 11 - Working document towards a liaison statement to Working Party 4C - Information regarding WRC-15 Agenda item 1.9.2

Word

2888140 bytes 2012-10-19 [88]�Annex 10 - Elements for a new Report on compatibility of the possible new MMSS (E-s) allocation in the 8 025-8 400 MHz band with EESS and SRS

Word

189551 bytes 2012-10-19 [88]�Annex 09 - Preliminary draft new Recommendation ITU-R SA.[EES/MET CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth Exploration-Satellite and Meteorological-Satellite Services, and for conducting sharing studies

Word

2170540 bytes 2012-10-18 [88]�Annex 08 - [Working document towards a] preliminary draft new Report ITU-R SA.[EESS 7-8 GHz_SHARING-SPACE] - Compatibility between EESS (Earth-to-space) and the Space Research service or the Space Operation service in the band 7 100-7 235 MHz

Word

48107 bytes 2012-10-18 [88]�Annex 07 - Preliminary draft revision of Recommendation ITU-R SA.1276-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 25.25-27.5 GHz

Word

62715 bytes 2012-10-18 [88]�Annex 06 - Preliminary draft revision of recommendation ITU-R SA.1275-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200 2 290 MHz

Word

63446 bytes 2012-10-18 [88]�Annex 05 - Working document towards a preliminary draft revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile services in the band 14.8-15.35 GHz

Word

186338 bytes 2012-10-18 [88]�Annex 04 - Preliminary draft revision of Recommendation ITU-R SA.1155 - Protection criteria related to the operation of data relay satellite systems

Word

75332 bytes 2012-10-17 [88]�Annex 03 - Working document towards a liaison statement to Working Party 4C - Information on systems operating in the 390 to 406 MHz and 406.1 to 420 MHz bands - WRC-15 Agenda item 9.1.1

Word

948079 bytes 2012-10-15 [88]�Annex 02 - Working document towards a preliminary draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range

Word

71034 bytes 2012-10-08 [88]�Annex 01 - Preliminary draft new Report ITU-R SA.[proximity operations] - Sharing conditions between space research service proximity operations links and fixed and mobile service links in the 410-420 MHz band

Word

81196 bytes 2012-11-12 [88]� - Report on the September 2012 meeting of Working Party 7B with a view to its next meeting (April 2013) (Manta, Ecuador, 24-28 September 2012)

Document :

ITU-R�WP7B� Contribution� 88

Title :

Report on the September 2012 meeting of Working Party 7B with a view to its next meeting (April 2013) (Manta, Ecuador, 24-28 September 2012)

Date :

2012-09-28

Source :

Chairman, WP 7B

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2012-11-12