|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
138170 bytes |
2015-05-08 |
[248]�Annex 11
- Liaison statement from ITU-T SG 5 - Concerning the liaison statement on comments on the WHO monograph |
|
Word
�
|
69500 bytes |
2015-05-07 |
[248]�Annex 10
- List of DBSG 3 table keepers and tables status |
|
Word
�
|
1098918 bytes |
2015-05-08 |
[248]�Annex 09
- Proposed modifications to Recommendations ITU-R P.452-15 and ITU-R P.2001-1 |
|
Word
�
|
299431 bytes |
2015-05-08 |
[248]�Annex 08
- Working document toward future revisions of Recommendation ITU-R P.681 - Propagation data required for the design of Earth-space land mobile telecommunication systems |
|
Word
�
|
190814 bytes |
2015-05-07 |
[248]�Annex 07
- Working document toward a preliminary draft revision of Recommendation ITU-R P.619-1 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth |
|
Word
�
|
253582 bytes |
2015-05-07 |
[248]�Annex 06
- Working document toward a preliminary draft revision of Recommendation ITU-R P.618-10 - Proposed revisions and future work |
|
Word
�
|
54473 bytes |
2015-05-07 |
[248]�Annex 05
- Proposed preliminary draft revision to Recommendation ITU-R P.618-11 - Propagation data and prediction methods required for the design of earth-space telecommunication systems |
|
Word
�
|
3313258 bytes |
2015-05-07 |
[248]�Annex 04
- Working document on the ice depolarization prediction method in Recommendation ITU-R P.618-11 |
|
Word
�
|
1092916 bytes |
2015-05-07 |
[248]�Annex 03
- Preliminary draft revision to Recommendation ITU-R P.617-3 - Propagation prediction techniques and data required for the design of trans-horizon radio-relay systems |
|
Word
�
|
52349 bytes |
2015-05-08 |
[248]�Annex 02
- Creation of the Correspondence Group 3M-11 on rain attenuation modelling in Recommendation ITU-R P.530 |
|
Word
�
|
563083 bytes |
2015-05-07 |
[248]�Annex 01
- Review of formatted tables for submission of measurements to Study Group 3 |
|
Word
�
|
74684 bytes |
2015-06-16 |
[248]�
- Report on the meeting of Working Party 3M (20-29 April 2015) |
|
|