International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3K : Contributions : 29 Recently posted�-� Search Meeting Documents
[29]� Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)

Format

Size

Posted

English

Word

60926 bytes 2012-09-13 [29]�Annex 10 - List of output documents

Word

4498994 bytes 2012-09-13 [29]�Annex 09 - Items retained from the Chairman's report for the meeting of Working Party 3K (Geneva, 17-26 october 2011)

Word

64052 bytes 2012-07-04 [29]�Annex 08 - Propagation data and prediction method required for the design of land-mobile to land-mobile telecommunication systems

Word

2827450 bytes 2012-07-04 [29]�Annex 07 - Preliminary draft revision of Recommendation ITU-R P.1411 - Propagation data and prediction methods for the planning of short-range outdoor radiocommunication systems and radio local area networks in the frequency range 300 MHz to 100 GHz

Word

86583 bytes 2012-07-04 [29]�Annex 06 - Preliminary draft revision of Recommendation ITU-R P.1238-7 - Propagation data and prediction methods for the planning of indoor radiocommunication systems and radio local area networks in the frequency range 900 MHz to 100 GHz

Word

3428880 bytes 2012-07-04 [29]�Annex 05 - A possible approach for the working document toward preliminary draft revision of Recommendation ITU-R P.1546 - Method for point-to-area predictions for terrestrial services in the frequency range 30 MHz to 3 000 MHz

Word

64811 bytes 2012-07-05 [29]�Annex 04 - List of Correspondence Group members

Word

50325 bytes 2012-07-04 [29]�Annex 03 - Editorial corrections to Recommendation ITU-R P.1546-4

Word

107886 bytes 2012-07-04 [29]�Annex 02 - Documents to be carried forward to the next meeting of Working Party 3K: Recommendation ITU-R P.1546

Word

55820 bytes 2012-07-04 [29]�Annex 01 - Proposed editorial corrections in Recommendation ITU-R P.1812-2

Word

101026 bytes 2012-09-13 [29]� - Report on the meeting of Working Party 3K (Geneva, 18-27 June 2012)

Document :

ITU-R�WP3K� Contribution� 29

Title :

Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)

Date :

2012-07-04

Source :

Chairman, WP 3K

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2012-09-13