|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
50331 bytes |
2014-01-09 |
[34]�Annex 10
- Working document towards draft CPM text on WRC-15 agenda item 9.2 - On the topic of defining radio stations operating in the meteorological aids service |
|
Word
�
|
56724 bytes |
2014-01-08 |
[34]�Annex 09
- Working document - Possible issues to be studied under WRC-15 agenda item 7 |
|
Word
�
|
516400 bytes |
2014-01-08 |
[34]�Annex 08
- A possible option on comprehensive review of the Radio Regulatory regime governing space services in non-planned bands under WRC agenda item 7 |
|
Word
�
|
58345 bytes |
2014-01-08 |
[34]�Annex 07
- Working document towards draft CPM text on WRC-15 agenda item 7 - Failure of a [newly launched] satellite during the ninety-day bringing into use period (Issue [G]) |
|
Word
�
|
762233 bytes |
2014-01-08 |
[34]�Annex 06
- Working document towards draft CPM text on WRC-15 agenda item 7 - Using one space station to bring frequency assignements at different orbital locations into use within a short period of time (Issue [F]) |
|
Word
�
|
62718 bytes |
2014-01-08 |
[34]�Annex 05
- Working document towards draft CPM text on WRC-15 agenda item 7 - Possible cancellation of advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations (Issue [E]) |
|
Word
�
|
52384 bytes |
2014-01-08 |
[34]�Annex 04
- Working document towards draft CPM text on WRC-15 agenda item 7 - Clarification of the capability of a space station when bringing into use frequency assignments under No. 11.44B of the Radio Regulations (Issue [D]) |
|
Word
�
|
54795 bytes |
2014-01-08 |
[34]�Annex 03
- Working document towards draft CPM text on WRC-15 agenda item 7 - Modifications to RR Appendix 30B in relation to the suspension of use of a frequency assignment (Issue [C]) |
|
Word
�
|
56521 bytes |
2014-01-08 |
[34]�Annex 02
- Working document towards draft CPM text on WRC-15 agenda item 7 - Publication of information on bringing into use of satellite networks at the ITU website (Issue B)
|
|
Word
�
|
63475 bytes |
2014-01-09 |
[34]�Annex 01 Revision 1
- Working document towards draft CPM text on WRC-15 agenda item 7 - Informing the BR of a suspension under RR No. 11.49 beyond six months (Issue A)
|
|
Word
�
|
76544 bytes |
2014-07-09 |
[34]�Revision 1
- Report on the meeting of the Working Party of the Special Committee (Geneva, 6-11 December 2013) |
|
|