International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions : 673 Recently posted�-� Search Meeting Documents
[673]� Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Format

Size

Posted

English

Word

832470 bytes 2011-06-02 [673]�

Document :

ITU-R�WP5B� Contribution� 673

Title :

Draft liaison statement to Working Parties 3J and 3M and Working Party 4B (for information only) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications (SATCOM) links to achieve the desired link availability

Date :

2011-06-01

Source :

United States of America

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-06-02