|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
150528 bytes |
2009-10-12 |
[109]�Annex 12
- Final list of participants |
|
Word
�
|
1050624 bytes |
2009-10-2 |
[109]�Annex 11
- Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems |
|
Word
�
|
183808 bytes |
2009-10-5 |
[109]�Annex 10
- Liaison statement to Working Party 6B - Study Group 4 SNG Series of Recommendations |
|
Word
�
|
1390080 bytes |
2009-10-1 |
[109]�Annex 09
- Working document towards a preliminary draft new Report or Recommendation - Impact of adaptive coding and modulation on availability objectives |
|
Word
�
|
285696 bytes |
2009-10-2 |
[109]�Annex 08
- Liaison statement to ITU-D Study Group 2 Q.22/2 for action and ITU-R Working Parties 4A and 5A for information - Draft list of terminology on emergency telecommunications |
|
Word
�
|
183296 bytes |
2009-10-1 |
[109]�Annex 07
- Working Document towards a preliminary draft new Report ITU-R M.[IP-MSS] - Reference system parameters for IP packet applications in the mobile-satellite service |
|
Word
�
|
2299904 bytes |
2009-10-1 |
[109]�Annex 06
- Preliminary draft new Report ITU-R S.[IPQoS-RPT] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks |
|
Word
�
|
184320 bytes |
2009-10-1 |
[109]�Annex 05
- Liaison statement to ITU-T Study Group 15 - Development of draft Recommendation G.hntreq |
|
Word
�
|
3416576 bytes |
2009-10-1 |
[109]�Annex 04
- Working Document towards preliminary draft new Reports and/or Recommendations - Reference network architectures, applications and performance, including QoS, for integrated systems operating within the mobile-satellite service in the 1-3 GHz bands
|
|
Word
�
|
1020928 bytes |
2009-10-2 |
[109]�Annex 03
- Working document towards a preliminary draft new Report ITU-R S.[CROSSLAYER] - Cross-layer based QoS provisioning in IP-based satellite networks including hybrid/integrated networks |
|
Word
�
|
180224 bytes |
2009-10-9 |
[109]�Annex 02
- Workplan for the twenty-seventh Meeting of Working Party 4B |
|
Word
�
|
224256 bytes |
2009-10-12 |
[109]�Annex 01
- List of documents issued |
|
Word
�
|
151552 bytes |
2009-10-12 |
[109]�
- Report on the twenty seventh meeting of Working Party 4B - (Geneva, 7-14 September 2009) |
|
|