International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4B : Contributions : 85 Recently posted�-� Search Meeting Documents
[85]� Report on the twenty sixth meeting of Working Party 4B - (Geneva, 22 - 29 April 2009)

Format

Size

Posted

English

Word

97792 bytes 2009-05-26 [85]�Annex 18 - Final list of participants

Word

533504 bytes 2009-05-18 [85]�Annex 17 - Proposed preliminary draft revision of Recommendation ITU-R S.1521 - Allowable error performance for a hypothetical reference digital path based on synchronous digital hierarchy

Word

198144 bytes 2009-05-18 [85]�Annex 16 - Working document towards a preliminary draft new Report or Recommendation - Impact of adaptive coding and modulation on availability objectives

Word

1077248 bytes 2009-05-18 [85]�Annex 15 - Working document towards a preliminary draft new Recommendation/Report on multi-carrier based techniques for satellite systems

Word

196608 bytes 2009-05-14 [85]�Annex 14 - Liaison statement to ITU-T Study Group 16 - Vehicle gateway platform

Word

107520 bytes 2009-05-14 [85]�Annex 13 - Liaison statement to Working Party 4C - Report on technical characteristics of the terrestrial component of an integrated system operating in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz

Word

110080 bytes 2009-05-26 [85]�Annex 12 - Liaison statement to the Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4C, 5A and 5C - Proposed definitions for "integrated MSS system" and "hybrid satellite/terrestrial system"

Word

2939392 bytes 2009-05-18 [85]�Annex 11 - Proposed modification to the working document towards preliminary draft new Reports and/or Recommendations on reference network architectures, applications and performance, including QoS, for integrated systems operating within the mobile-satellite servic

Word

106496 bytes 2009-05-26 [85]�Annex 10 - Draft new Question ITU-R [HYBRID]/4 - System architecture and performance aspects on hybrid satellite and terrestrial systems

Word

761856 bytes 2009-05-18 [85]�Annex 09 - Working document - Terminology used for networks using both satellite and terrestrial links

Word

113152 bytes 2009-05-26 [85]�Annex 08 - Liaison statement to ITU-T SG 13, ITU-R WP 4A and WP 4C - Response to ITU-T SG 13 liaison on establishment of Focus Group on future networks (FG-FN)

Word

206848 bytes 2009-05-14 [85]�Annex 07 - Liaison statement to ITU-T Study Group 15 - Development of draft Recommendation G.hntreq

Word

1400832 bytes 2009-05-15 [85]�Annex 06 - Working document towards a preliminary draft new Recommendation ITU-R S.[CROSS_LAYER] - Cross-layer based QoS provisioning in IP-based satellite networks

Word

847872 bytes 2009-05-15 [85]�Annex 05 - Working document towards a preliminary draft new Report ITU-R S.[CROSSLAYER] - Cross-layer based QoS provisioning in IP-based satellite networks

Word

2161664 bytes 2009-05-15 [85]�Annex 04 - Preliminary draft new Report ITU-R S.[IPQoS-RPT] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks

Word

4868608 bytes 2009-05-15 [85]�Annex 03 - Preliminary draft new Recommendation ITU-R S.[IPQoS] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks

Word

115200 bytes 2009-05-26 [85]�Annex 02 - Workplan for the twenty sixth meeting of Working Party 4B

Word

147456 bytes 2009-05-26 [85]�Annex 01 - List of documents issued (Documents 4B/51 - 4B/83)

Word

157184 bytes 2009-05-27 [85]� - Report on the twenty sixth meeting of Working Party 4B (Geneva, 22 - 29 April 2009)

Document :

ITU-R�WP4B� Contribution� 85

Title :

Report on the twenty sixth meeting of Working Party 4B - (Geneva, 22 - 29 April 2009)

Date :

2009-04-29

Source :

Chairman, WP 4B

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2009-05-27