International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions : 197 Recently posted�-� Search Meeting Documents
[197]� Report on the meeting of Working Party 4A (Geneva, 27 April to 5 May 2009)

Format

Size

Posted

English

Word

143872 bytes 2009-05-29 [197]�Annex 23 - List of liaison statements to ITU-R Groups

Word

137216 bytes 2009-05-29 [197]�Annex 22 - Preliminary working document towards implementation of Resolution 80 (Rev.WRC-07) - Stage 1 of the Working Party 4A work plan

Word

275968 bytes 2009-05-15 [197]�Annex 21 - Working document towards the development of draft CPM text on WRC-11 Agenda item 1.13

Word

210944 bytes 2009-05-15 [197]�Annex 20 - Revision of the Work Plan for WRC-11 Agenda item 1.13 - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3

Word

103424 bytes 2009-05-29 [197]�Annex 19 - Executive summary on the status of preparations under WRC-11 Agenda item 1.13

Word

110080 bytes 2009-05-28 [197]�Annex 18 - Working document - possible revision of Recommendation ITU-R BO.1785

Word

590336 bytes 2009-05-28 [197]�Annex 17 - Working document - Information in consideration of WRC-11 Agenda Item 1.22

Word

104960 bytes 2009-05-28 [197]�Annex 16 - Working Document on balancing the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band

Word

21445120 bytes 2009-05-29 [197]�Annex 15 - Working document towards a preliminary draft revision of Report ITU-R BO.2071 - System parameters of BSS between 17.3 GHz and 42.5 GHz and associated feeder links

Word

1366528 bytes 2009-05-18 [197]�Annex 14 - Working document towards a Preliminary draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz

Word

172032 bytes 2009-05-29 [197]�Annex 13 - Working document towards a preliminary draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3

Word

297984 bytes 2009-05-29 [197]�Annex 12 - Working document towards a preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth station antenna side-lobe peaks

Word

729088 bytes 2009-05-15 [197]�Annex 11 - Working document toward a preliminary draft new Recommendation ITU R [SF].[STATMETH] - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz

Word

413184 bytes 2009-05-18 [197]�Annex 10 - Working documents towards a preliminary draft new Recommendation and/or Report - C/(N+I) coordination methodology

Word

196096 bytes 2009-05-18 [197]�Annex 09 - Working document towards a PDN Recommendation ITU-R BO.[BSS(S) INTERF CRITERIA SAT]

Word

149504 bytes 2009-05-29 [197]�Annex 08 - Working document towards a preliminary draft new Recommendation ITU-R BO.[BSS(S) TECH CHAR SAT] - Technical characteristics of broadcasting-satellite service (sound) satellite networks in the band 1 467-1 492 MHz

Word

3978240 bytes 2009-05-29 [197]�Annex 07 - Preliminary draft new Report ITU-R S.[ADAP_ARRAY] - An interference reduction technique by adaptive-array earth station antennas for sharing between fixed-satellite service (FSS) and fixed/mobile services

Word

1215488 bytes 2009-05-18 [197]�Annex 06 - Modification to preliminary draft new Report ITU-R S.[MAIN LOBE] - Methodology on the modelling of earth station antenna gain in the region of the antenna main lobe and the transition region between the minimum angle of the reference antenna pattern and t

Word

3672576 bytes 2009-05-11 [197]�Annex 05 - Preliminary draft new Report ITU-R S.[BWA-FSS] - Studies on compatibility of broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band

Word

293888 bytes 2009-05-29 [197]�Annex 04 - Preliminary draft new Report ITU-R S.[GUIDE_PLAN] - Guidelines that maybe used by administrations in the design of their systems for assessing the impact of rain attenuation on the carrier to noise plus interference ratios of the FSS Plan allotments

Word

13757952 bytes 2009-06-12 [197]�Annex 03 - Preliminary draft revision of Recommendation ITU-R S.1001-1 - Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations

Word

17284096 bytes 2009-05-11 [197]�Annex 02 - Preliminary draft new Recommendation ITU R S.[IMT-PFD] - Methodologies for determining whether an IMT station at a given location operating in the band 3 400-3 600 MHz would transmit without exceeding the power flux-density limits in Nos. 5.430A, 5.432A,

Word

2361344 bytes 2009-05-29 [197]�Annex 01 - Preliminary draft new Recommendation ITU-R S.[VEHICLE_E/S] - Methodologies to estimate the off-axis e.i.r.p. levels and to assess the interference towards adjacent satellites resulting from pointing errors of vehicle-mounted earth stations in the 14 GHz f

Word

343552 bytes 2009-06-12 [197]� - Report on the meeting of Working Party 4A (Geneva, 27 April - 5 May 2009)

Document :

ITU-R�WP4A� Contribution� 197

Title :

Report on the meeting of Working Party 4A (Geneva, 27 April to 5 May 2009)

Date :

2009-05-06

Source :

Chairman, WP 4A

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2009-06-12