International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1A� C�

ITU-R�WP1A

Spectrum engineering techniques

Results:17 total items.
Contributions �[�AI/Question:�221-1/1�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 360 ]
Comments on the working document towards a preliminary draft modification of Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz � CBS, Inc. 221-1/1 2011-05-17
[ 359 ]
Working document toward a draft revision of Recommendation ITU-R SM.1879 - The impact of power line high date rate telecommunication systems on radiocommunication systems � CBS, Inc. 221-1/1 2011-05-17
[ 358 ]
Additions to the preliminary draft new Report ITU-R SM.[PLT + 80 MHZ] - Impact of power line telecommunications systems on radiocommunication systems operating in the VHF and UHF bands above 80 MHz � CBS, Inc. 221-1/1 2011-05-17
[ 347 ]
Liaison statement to Working Party 1A - Impact of power line transmissions on the mobile-satellite service and radiodetermination-satellite service below 470 MHz � WP 4C 221-1/1 2011-05-13
[ 301 ]
Liaison statement to the Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Further work on power line telecomunications � WP 7D 221-1/1 2010-06-17
[ 293 ]
Proposed modifications to Report ITU-R SM.2158 - Characteristics of radio frequency emission from PLT systems � Japan 221-1/1 2010-06-14
[ 292 ]
Proposed modifications to Report ITU-R SM.2158 - Experimental results of a subjective assessment test on HF broadcast reception interfered with by PLT � Japan 221-1/1 2010-06-14
[ 291 ]
Proposed modifications to preliminary draft new Recommendation ITU-R SM.[PLT] � Japan 221-1/1 2010-06-14
[ 286 ]
Support for a Recommendation and Report on power line high data rate telecommunication systems � CBS, Inc. 221-1/1 2010-06-14
[ 259 ]
Liaison statement to Working Party 1A (copy to ITU-R Working Party 5B and ITU-T Study Group 15) - Impact of power line transmissions on the mobile-satellite service and radionavigation-satellite service below 200 MHz � WP 4C 221-1/1 2010-04-30
[ 226 ]
Draft revision to Question ITU-R 221-1/1 � North American Broadcasters Association (NABA) 221-1/1 2010-01-20
[ 214 ]
Reply to a liaison statement from Working Party 1A - Further work on PLT � WP 5C 221-1/1 2009-12-08
[ 187 ]
Working document towards a PDNR on "Power line high data rate telecommunications systems" � Brazil (Federative Republic of) 221-1/1 2009-09-08
[ 178 ]
Support for the NABA revisions to the PDNR on power line high data rate telecommunication systems � CBS, Inc. 221-1/1 2009-09-08
[ 104 ]
Support of the NABA studies on PLT emissions at the CRC laboratory � CBS, Inc. 221-1/1 2009-02-11
[ 102 ]
Towards a PDNR on "Power line high data rate telecommunications systems" � World Broadcasting Unions - Technical Committee 221-1/1 2009-02-10
[ 99 ]
Further work on the PDNR "Power line high data rate telecommunications systems" � North American Broadcasters Association (NABA) 221-1/1 2009-02-05
Results:17 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-8