|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
85504 bytes |
2005-12-22 |
[171]�Annex 11
- Status of Questions assigned to Working Party 9D |
|
Word
�
|
366592 bytes |
2005-12-21 |
[171]�Annex 10
- Working document toward a preliminary draft revision to Recommendation ITU-R F.758 |
|
Word
�
|
65024 bytes |
2005-12-22 |
[171]�Annex 09
- Draft Liaison statement to Working Party 7C - Information relating to the use of the 6-7 GHz band by the fixed service |
|
Word
�
|
71168 bytes |
2005-12-21 |
[171]�Annex 08
- Draft Liaison statement to Working Party 7C - Assessment of compatibility between the EESS (active) and the fixed service in the 9 800-10 000 MHZ band |
|
Word
�
|
66048 bytes |
2005-12-21 |
[171]�Annex 07
- Draft Liaison statement to Working Party 7B - Proposed draft CPM text for WRC-07 Agenda item 1.2 (Resolution 746, 18 GHz) |
|
Word
�
|
518656 bytes |
2005-12-21 |
[171]�Annex 06
- Working document towards a preliminary draft new Recommendation - Technical and operational characteristics of systems in the fixed service to facilitate sharing with the Earth exploration-satellite (passive) and space research (passive) services in the b |
|
Word
�
|
6299648 bytes |
2005-12-21 |
[171]�Annex 05
- Working document towards a Preliminary Draft New Recommendation - Technical and operational characteristics of systems in the fixed service to facilitate sharing with the Earth exploration-satellite (passive) and space research (passive) services in the b |
|
Word
�
|
84480 bytes |
2005-12-21 |
[171]�Annex 04
- Working document - Considerations for progressing the work concerning sharing the bands 10.6-10.68 GHz and 36-37 GHz by the fixed service and Earth exploration service (passive) in preparation for WRC-07 Agenda item 1.2 - Elements of a Work Plan for WP 9D |
|
Word
�
|
146944 bytes |
2005-12-21 |
[171]�Annex 03
- Preliminary Draft New Recommendation ITU-R F.[ENG] - System characteristics for sharing with analogue and digital television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the fixed service |
|
Word
�
|
102912 bytes |
2005-12-21 |
[171]�Annex 02
- List of output (temp) documents |
|
Word
�
|
108544 bytes |
2005-12-15 |
[171]�Annex 01
- Structure and work plan |
|
Word
�
|
163328 bytes |
2006-03-13 |
[171]�
- Report on the meeting of Working Party 9D (Geneva, 22-30 November 2005) |
|
|