|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
146432 bytes |
2007-06-14 |
[249]�Annex 14
- Historical record of the Working Party meetings |
|
Word
�
|
192000 bytes |
2007-06-13 |
[249]�Annex 13
- List of acronyms, abbreviations and terms defined in the draft Recommendations/Reports developed at the May 2007 Working Party 9B meeting |
|
Word
�
|
64512 bytes |
2007-06-13 |
[249]�Annex 12
- Draft liaison statement to Working Parties 8A and 8F |
|
Word
�
|
70144 bytes |
2007-06-13 |
[249]�Annex 11
- Working document towards a PDNR ITU-R F.[FWA-2.5 GHz] - Frequency block arrangements for fixed wireless access systems in the range 2 500-2 690 MHz |
|
Word
�
|
71168 bytes |
2007-06-13 |
[249]�Annex 10
- Working document towards a PDNR ITU-R F.[COMPATIBILITY] - Guidelines for addressing compatibility between fixed service systems operating in neighbouring countries in the frequency range above 1 GHz |
|
Word
�
|
68096 bytes |
2007-06-13 |
[249]�Annex 09
- Preliminary draft new Question ITU-R [COMP/9] - Guidelines for addressing compatibility between fixed service systems, operating in neighbouring countries in the frequency range above 1 GHz |
|
Word
�
|
94208 bytes |
2007-06-14 |
[249]�Annex 08
- Preliminary draft revision of Report ITU-R F.2086 - Technical and operational characteristics and applications of broadband wireless access in the fixed service |
|
Word
�
|
59392 bytes |
2007-06-15 |
[249]�Annex 07
- Note for a carried-over document |
|
Word
�
|
209408 bytes |
2007-06-13 |
[249]�Annex 06
- PDN Report ITU-R F.[HAPS-FS] - Consideration of technical aspects related to procedures for effecting coordination or seeking agreement and associated technical criteria and system characteristics to be used with respect to HAPS |
|
Word
�
|
72704 bytes |
2007-06-13 |
[249]�Annex 05
- Considerations on Questions assigned to Working Party 9B |
|
Word
�
|
58368 bytes |
2007-06-13 |
[249]�Annex 04
- Liaison statements to other fora |
|
Word
�
|
96256 bytes |
2007-06-13 |
[249]�Annex 03
- List of output (TEMP) documents |
|
Word
�
|
81920 bytes |
2007-06-13 |
[249]�Annex 02
- Status of the Questions assigned to Working Party 9B |
|
Word
�
|
66048 bytes |
2007-06-13 |
[249]�Annex 01
- Structure of work |
|
Word
�
|
167936 bytes |
2007-06-15 |
[249]�
- Report on the meeting of Working Party 9B (Geneva, 8-16 May 2007) |
|
|