|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
80384 bytes |
2006-02-01 |
[33]�Annex 05
- Draft of press release - Possible future changes of coordinated universal time (UTC) and the leap second correction method |
|
Word
�
|
96768 bytes |
2006-02-01 |
[33]�Annex 04
- Letter from the Director of the Radiocommunication Bureau - Documentation of 2005 leap second experience |
|
Word
�
|
72192 bytes |
2005-12-20 |
[33]�Annex 03
- Summary Report of Special Rapporteur Group (SRG) on the future of the UTC timescale activities through 2005 |
|
Word
�
|
1614336 bytes |
2005-12-21 |
[33]�Annex 02
- Interference between standard frequency and time signal service operating between 20 and 90 kHz using method 1 |
|
Word
�
|
425472 bytes |
2005-12-21 |
[33]�Annex 01
- Interference between standard frequency and time signal services operating at low frequencies |
|
Word
�
|
91136 bytes |
2006-08-22 |
[33]�
- Chairman's report - Meeting 8-11 November 2005 |
|
|