International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient orbit/spectrum utilization

Results:15 total items.
Contributions �[�Source:�WP 7B�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 397 ]
Liaison statement to Working Party 4A and Working Party 4B for information - Impact of Recommendation ITU-R S.1432 on the use of the band 18.1-18.3 GHz � WP 7B 2007-02-16
[ 396 ]
Draft liaison statement to Working Party 4A - PDNR on frequency sharing between Space VLBI and Lunar systems of the SRS and FSS systems in the 37.5-38 GHz band � WP 7B 211/7 2007-02-16
[ 384 ]
Liaison statement concerning the proposed preliminary draft new Reports ITU-R SA.[SVLBI FSS 38 GHz] and SA.[LUNAR FSS 38 GHz] for frequency sharing between SRS and FSS systems in the 37.5-38 GHz band � WP 7B 211/7, 202/7 2006-09-05
[ 381 ]
Liaison statement to WP 4A - Additional compatibility assessment between new fixed-satellite service systems and the meteorological satellite service around 18 GHz � WP 7B 2006-09-01
[ 380 ]
Liaison statement to WP 4A and WP 4B for information - Comments related to the applicability of Recommendation ITU-R S.1432 to the frequency band 18.1-18.3 GHz � WP 7B 2006-09-01
[ 265 ]
Liaison statement to WP 4A - Proposed draft CPM text for WRC-07 Agenda item 1.2 (Resolution 746 (WRC-03), 18 GHz) � WP 7B 2005-11-14
[ 148 ]
Liaison statement to Working Party 4A - Sharing between space research service (Space VLBI telemetry) and fixed-satellite service in the 37.5-38 GHz band � WP 7B 2005-04-07
[ 147 ]
Liaison statement to Working Party 4A - Compatibility studies between the meteorological-satellite service and the fixed-satellite service in the band 18.0-18.4 GHz � WP 7B 2005-03-29
[ 146 ]
Liaison statement to Working Party 4A - Request for guidance on the possible use of the band 27.0-27.5 GHz by NGSO FSS systems � WP 7B 2005-03-29
[ 113 ]
Liaison statement to Working Party 4A - Compatibility studies between the meteorological satellite service and the fixed-satellite service in the band 18.0-18.4 GHz � WP 7B 2004-10-04
[ 112 ]
Liaison statement to WP 4A - Sharing between non-GSO/GSO inter-satellite links and GSO/GSO inter-satellite links in the bands 22.55-23.55 GHz and 25.5-27.5 GHz � WP 7B 2004-10-04
[ 109 ]
Liaison statement to WP 4A - Sharing between space research service (space VLBI telemetry) and fixed satellite service in the 37.5-38 GHz band � WP 7B 2004-10-04
[ 28 ]
+Corr.1
Liaison statement to WP 4A - Sharing between the space research service (space very long baseline interferometry telemetry) and the fixed satellite service in the 37.5-38 GHz band � WP 7B 211/7 2004-03-25
[ 26 ]
Liaison statement to WP 4A - Sharing analyses between geostationary meteorological satellite systems operating in the space-to-Earth direction and the fixed, fixed-satellite and mobile service systems in the band 18-18.4 GHz � WP 7B 2004-03-22
[ 9 ]
Liaison statement to Working Parties 4A, 8A and 9D - Sharing analyses between geostationary meteorological satellite systems operating in the space-to-Earth direction and the fixed, fixed-satellite and mobile service systems in the band 18-18.4 GHz � WP 7B 2003-10-27
Results:15 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9